Treasurer’s Report for Accounts to year end Dec 31[st] ‘24

Compared to the end ’23 trading position we have a decrease for ’24 of £18,142.54

1

Chapmanslade Village Hall (and Memorial Ground)

AGM April 2025

Through the year the Committee arranged a number of quite varied community events including a musical bingo event, 2 quizzes [as ever hosted by the “two Bobs”, 3 No film nights, a comedy night [hosted by Jared Christmas], a rounder’s evening, a few informal Friday evening “social” evenings, a midsummer BBQ, the usual cream Teas / Croquet afternoon to test skills with the mallet / balls and the fantastic celebration on 28[th] September to mark the 50[th] anniversary of our hall construction. In addition the Hall hosted 20 Bingo evenings that proved extremely popular [but not my personal cup of tea!].

The net profit arising from these events was approx. £2,250.

2

Chapmanslade Village Hall (and Memorial Ground)

AGM April 2025

In ’23 the Committee had purchased new portable goal posts and undertaken repairs at the children playground, anticipating reimbursement of some of the costs may have been possible via the CIL funds arising from the Honey Glade development at Barters Farm, however the subsequent application to the Parish Council was not successful due to timing of the expenditure.

This legislation requires all businesses to separate food waste and sorting recyclables like paper, plastics, metals, and cartons into Dry Mixed Recycling (DMR) bins. Glass must also be collected in a separate container.

3

Chapmanslade Village Hall (and Memorial Ground)

AGM April 2025

viii. Maintenance and Improvement Projects

There have been a number of maintenance activities and projects undertaken during the year comprising the following key items – at a total cost of approx. £28,043 :-

(i) purchase of the ride-on mower for the playing field - principally S106 funding, (ii) repairs to the pavilion roof & rain goods and refurbishment of the hall entrance foyer roof, (iii) material for continuing build of the trim track, (iv) boarding out of the pavilion ceiling area, (v) concreting the pavilion garage area.

The Hall continues to target repairs and improvement projects against a priority list (flexibly managed by the Committee), and where applicable to reflect where practical the outcome of the PC sponsored Parish Plan which arose from the “Voice of the Village” consultation in 2017 / 2018.

The current identified, and prioritised, project list is summarised below.

Item Scope Cost /
Estimate
Priority
Category
A/B/C
Comment
Plans in Place or Pending
Manage old trees Ongoing need to trim back
as necessary
£250 A Some hand equipment
purchased from the grant
awarded mid ’20 by the
Warminster Area Board.
Repoint areas of hall
brickwork
Absence of mortar to
vertical construction joints,
and deterioration to bricks /
mortar near damp proof
course
£925 A Re-pointing required – Tad
Ballam engaged – awaiting
attendance date.
Enhancement to
existing playground
– exercise
equipment (“trim
track”)
Approx. 400m long all-
weather track around the
perimeter of the playing
field
~ £1,500 A / B Update – approx. 50% [?] with
balance when possible through
2025. Volunteer labour, surface
material [Hoggin] and terram
to bepurchased.
General decorating
in toilets and
entrance foyer
Aspects looking “tired” ~ £500 A / B General decorating – volunteer
labour with materials to
purchase
Redevelopment of
old cricket pavilion
No current facilities for
users of the playing field
(occasional intrusion for use
of hall facilities when open
for hire groups)
£2,500? A / B Doors & windows replaced.
Funded through Area Board
grant.
Intention to run in power and
water – lay buried ducts in first
instance [i.e. piecemeal
development].
New background
heating system
Existing system based on
disused ducted air (+ 40
years old), 3 convection
radiators and 4 No infra-red
heaters.
£5,000 -
£7,500 est.
contribution
from hall
funds
A / B Research / enquiries / quotes
in progress for an integrated
solution.
Ambition to install solar PV’s
with inverter and battery
storage, potentially an air
source heat pump, possibly air
conditioning units. Viability of
replacement ducted air
replacement heaters also being
considered.
Will require grant funding to
realise.

4

AGM April 2025

Chapmanslade Village Hall (and Memorial Ground)

£4,000 provisionally allocated
from the PC from CIL funds.
Development of bar
area
Create doorway into existing
bar area in lieu of hatch.
Install the mobile bar as a
semi-permanent feature
[with enclosingshutters.
£1,500? B To be done
Drinks glasses - hall only has
glass for wine, propose
same for other drinks
(sustainable approach)
£250 B To be done
Glass washer £600 B To be done
Enhancement /
Repairs to children
playground
Replace buried rubber mats
with permanent rubber
surfaces
£2,500 to
£7,500
B / C Funding required from
awarded grants – scope to be
agreed
Further
Enhancement to
existing playground
facilities
Initial Hall donation to
initiative by separate village
Playground Committee
£5,000 -
£7,500
C Initiative started in 2017, with
quote obtained by specialist
provider (~ £55,000).
Update – Hall Committee has
determined that new
equipment [as opposed to
repairs] should not be funded
from Hall income, but from
grants etc.Ideally a separate
development sub-committee
should be appointed to pursue
this.
Additional meeting
room
Long term ambition to allow
concurrent hall user to meet
expected future demand,
and for groups not requiring
the large main hall
£125,000? C Research required and high
level order of cost to be
identified. Consider against
the 2019 Parish Plan and
pending Church use as a small
community hire space.
Works Completed
Resolve damp
within the 2 No
“chair cupboards”
Rain ingress due to very low
pitch of the tiled roof (too
shallow)
£8,244 Batstone engaged to start April
’24 – scope to remove and
rebuild the porch roof.
Done April ‘24
CCTV System Enhanced security to the
hall and grounds
£600 Intended installation of a 2nd
hand system 2ndqtr ‘24
Done June ‘25
Enhancement /
Repairs to children
playground
Repairs to equipment,
attributed to general wear &
tear
New weather shelter to be
installed [[canopy ex Barters] –
2ndqtr ’25. Volunteer labour.
Resolving localised
uplift in hall block
flooring
Two areas of uplift have
occurred. Initial action to
deploy dehumidifiers
[advice by OEM flooring
contractor]
~£400 Short term hire of a
dehumidifier and running
costs.
Done 2ndqtr ’24 –
demonstration lower humidity
does reduce floor uplift.
Damaged/missing ridge
tiles, rotten facia / soffit
boards,broken raingoods
£4,700 Batstone engaged to undertake
April ’24.
Done April ’24.
Board roof space ~ £2,000 Board out roof space pending
by volunteer group.
Done 3rd qtr ’24.
Develop garage area £1,750 Garage floor concreted March
’24 after new heavy steel doors
installed. Done.

ix. The total amount invested over the past 20 years (including undertaking structural repairs to the hall roof) continues to increase and now approx. £191,000. This has been expended on a

5

Chapmanslade Village Hall (and Memorial Ground)

AGM April 2025

huge variety of projects – primarily improvements to the hall and its other amenities [the memorial grounds and recently the old cricket pavilion] and general maintenance.

This very substantial sum [re-estimated] has originated from:-

That said, there are many others within the community [“unseen”] that support when events are organised and their contributions are instrumental.

The Committee is always looking for new members and the role of Secretary remains available for anyone interested in helping to make a difference.

The Committee has a Reserves Policy to provide the rationale for what reserves are held by the Hall and their purpose. The Policy is intended to be reviewed on an annual basis after the AGM unless an emergency situation arises.

Analysis of Reserves:

Analysis of Reserves:
Total Reserves at 31stDec 2024 £ 40,168
Restricted Funds [specific grants and/or donations] £2,000 [P.C]
Designated Funds [flexibly managed]
Contingency [repairs & income protection] - estimate £10,000
Projects funding [long term accrual] £12,650
£22,650
Projects funding [short / medium term] - estimate £15,500

This concludes the Treasurers report.

If anyone has any questions then please forward to my email address t.humphreys165@gmail.com and I'd be happy to respond.

T Humphreys (Treasurer)

6

CHAPMANSLADE VILLAGE HALL Ac¢ounts for the 12 months ending 31st December 2024 2024 2023 2022 2021 2020 Receipts and Payments Receipts: Hall Bookings Ac£ess Rights etc. Fundraising Ineti & tmticm Interest R&eNed Grants Re￿￿ 11,126 183 5.148 8.971 193 2.165 4,725 118 3.877 10 16,564 4.517 103 3,215 2,764 4,0(X) 4,000 15,846 28.168 16.930 20,457 16,457 15,329 11,329 25,294 8,730 23,686 7.840 T¢)tsl exc Granls Payments: Hall Running Costs & Admin. Repairs, maintenan Totsl 15.573 10,367 7,263 3,048 1,749 4.797 4,932 2,253 7,185 29.888 16.857 11,296 Surplus befor8 capitsl costs 1 revenues -1.721 3.600 4.033 20,497 16,501 Proceeds of Land Sale Capital costs paid -16.422 -5.581 -1.710 -9.458 -2,976 Excess of Receipts over Payments -18.142 -1.981 2.324 11.039 13,525 Balance Sheet Accumulated Fund 2024 2023 2022 2021 2020 58.311 -18.142 60.292 -1,981 33.404 13,525 Sufplus for year 2.324 11.039 40,168 58,311 46.929 Net ammount lexcEss ￿￿4p1 over pawrrtsl less grants ￿'d -5,981 -L676 -2321 Represented by: Cash l Bank l BuikJiryJ Stiiety FuThJs 40168 58.311 .291 46.929 Change in year Note.. At Ihe year-end the organIsat￿ aiso held bar slc valued al £130 -18.142 -1.981 13525 Approved by the Treasurer. On behalf of the Village Hall CL¥nmittee Scrutineerfs Re ort to the Trustees of the Cha manslade Villa e Hall Tim HumFthreys Date: 26.01.25 Respectlve ￿p￿￿￿bI1￿1U trfTrust¢•a •nd S¢ruUne•r ts Iheviligga Hall T￿$1￿ >fyJ are respwNef￿th9 ￿￿?80￿nts. u￿S￿￿6r thai norther e audit ￿ IndepwKknttxamKiation oftsCharthsa 1993 apFty. 118 rewst¥htytht C8ry>Y outan al￿11 nor￿dependen1xam￿￿kn ￿ stru¢mMo thO￿￿jnts and lo r8F¢M to ￿. Ba$ls olS¢ruiinEe¢s Statement a¢xxrtarK81￿th the dirth￿ gNeft bytheVi* I hav• &7ubnw tha T￿￿d$ the actounts sel out aLwe. Scnrfnfja￿s $tateme In rnY0pin￿ th•a￿D￿are in aL¥￿danLXwi￿ Lhè wodu Mrcoln B811 150 High StyoaL Chapm8nYad8. We8tbyry. Wiltthr¢ BA13 4NP ILfr1031ioP(

CHAPMANSLADE VILLAGE HALL Ac¢ounts for the 12 months ending 31st December 2024 2024 2023 2022 2021 2020 Receipts and Payments Receipts: Hall Bookings Ac£ess Rights etc. Fundraising Ineti & tmticm Interest R&eNed Grants Re￿￿ 11,126 183 5.148 8.971 193 2.165 4,725 118 3.877 10 16,564 4.517 103 3,215 2,764 4,0(X) 4,000 15,846 28.168 16.930 20,457 16,457 15,329 11,329 25,294 8,730 23,686 7.840 T¢)tsl exc Granls Payments: Hall Running Costs & Admin. Repairs, maintenan Totsl 15.573 10,367 7,263 3,048 1,749 4.797 4,932 2,253 7,185 29.888 16.857 11,296 Surplus befor8 capitsl costs 1 revenues -1.721 3.600 4.033 20,497 16,501 Proceeds of Land Sale Capital costs paid -16.422 -5.581 -1.710 -9.458 -2,976 Excess of Receipts over Payments -18.142 -1.981 2.324 11.039 13,525 Balance Sheet Accumulated Fund 2024 2023 2022 2021 2020 58.311 -18.142 60.292 -1,981 33.404 13,525 Sufplus for year 2.324 11.039 40,168 58,311 46.929 Net ammount lexcEss ￿￿4p1 over pawrrtsl less grants ￿'d -5,981 -L676 -2321 Represented by: Cash l Bank l BuikJiryJ Stiiety FuThJs 40168 58.311 .291 46.929 Change in year Note.. At Ihe year-end the organIsat￿ aiso held bar slc valued al £130 -18.142 -1.981 13525 Approved by the Treasurer. On behalf of the Village Hall CL¥nmittee Scrutineerfs Re ort to the Trustees of the Cha manslade Villa e Hall Tim HumFthreys Date: 26.01.25 Respectlve ￿p￿￿￿bI1￿1U trfTrust¢•a •nd S¢ruUne•r ts Iheviligga Hall T￿$1￿ >fyJ are respwNef￿th9 ￿￿?80￿nts. u￿S￿￿6r thai norther e audit ￿ IndepwKknttxamKiation oftsCharthsa 1993 apFty. 118 rewst¥htytht C8ry>Y outan al￿11 nor￿dependen1xam￿￿kn ￿ stru¢mMo thO￿￿jnts and lo r8F¢M to ￿. Ba$ls olS¢ruiinEe¢s Statement a¢xxrtarK81￿th the dirth￿ gNeft bytheVi* I hav• &7ubnw tha T￿￿d$ the actounts sel out aLwe. Scnrfnfja￿s $tateme In rnY0pin￿ th•a￿D￿are in aL¥￿danLXwi￿ Lhè wodu Mrcoln B811 150 High StyoaL Chapm8nYad8. We8tbyry. Wiltthr¢ BA13 4NP ILfr1031ioP(