OpenCharities

This text was generated using OCR and may contain errors. Check the original PDF to see the document submitted to the regulator.

2022-12-31-accounts

EATON BRAY HALL MANAGEMENT COMMITTEE

INCOME AND EXPENDITURE ACCOUNT 31st DECEMBER 2022

2021
£
£
INCOME
£

27436
HALL LETTINGS

638 BANK INTEREST
17906
GOVERNMENT GRANTS RE:COVID
---------
45980
EXPENDITURE
853
RENT 921
82 WATER 865
1705
LIGHTING AND HEATING
2238
1549INSURANCE 1736
645
WINDOW CLEANING & CLEANING SUPPLIES
798
4780
CONTRACT CLEANING
7615
1940
BOOKING CLERK
4150
1295 CARETAKER 1430
681 ADVERTISING 382
- PERFORMING RIGHTS 1417
- STAGE CURTAINS 1779
3271
REPAIRS AND MAINTENANCE
12939
859 POSTGS/STNRY/TEL./PHTOCPYNG/BROADBND 786
180 ALCOHOL LICENCE 180
126 GRATUITIES - AUDITOR and ROSS BAGNI -
17966

28014 EXCESS OF INCOME OVER EXPENDITURE
INCOME
£

HALL LETTINGS

BANK INTEREST
GOVERNMENT GRANTS RE:COVID


EXPENDITURE
£
37433
1222
3732
--------
42387
37236
5151

EATON BRAY HALL MANAGEMENT COMMITTEE STATEMENT OF AFFAIRS AS AT 31st DECEMBER 2022


Balance brought forward from 31.12.21

ADD
Donations -
ADD
2022 Excess of Income over Expenditure


DEDUCT

Balance brought forward from 31.12.21

ADD
Donations -
ADD
2022 Excess of Income over Expenditure


DEDUCT

Balance brought forward from 31.12.21

ADD
Donations -
ADD
2022 Excess of Income over Expenditure


DEDUCT

Balance brought forward from 31.12.21

ADD
Donations -
ADD
2022 Excess of Income over Expenditure


DEDUCT

Balance brought forward from 31.12.21

ADD
Donations -
ADD
2022 Excess of Income over Expenditure


DEDUCT
DEVELOPMENT FUND

96822

575


__ _

97397

_

97397
5151
_
102548
_
DEVELOPMENT FUND

96822

575


__ _

97397

_

97397
5151
_
102548
_
TOTALS
106822
575
5151
______
112548
5151
______
107397
5151
______
112548
______










10000

5151
______

15151


















Transfer to Dev.Fund


ADD
Transfer from General Fund



REPRESENTED BY:-
CO-OPERATIVE BANK:-
A/Cs. NO. 6511649200/50
UNIITED TRUST BANK

Examiner’s Certificate

5151
______

10000

______
10000
______










I have examined the books and records for the above committee, supplemented by information and explanations given to me. In my opinion the Income and Expenditure Account and Statement of Affairs show a true and fair reflection of the Accounting Year as at 31[st] December 2022 C.Siddons (Examiner) ____ 34 Wallace Drive, Eaton Bray, Dunstable,Beds. Date_______

Chairman’s Report Eaton Bray Village Hall (2022-2023)

First and foremost, I would like to express my heartfelt gratitude to each and everyone for your support and dedication. Without your collective efforts and commitment, we would not be where we are today. Together we have achieved some excellent results following what has been some difficult times over the last few years.

This past year has seen a flurry of activity covering the refurbishment of the hall and of equal importance our improved methods of how we as a committee communicate and interact. Progress had been made on the refurbishment of the kitchen that include refreshing the units, replacing the appliances. In addition we have installed a new floor mounted gas boiler and a new service hatch. All of this work has elevated the condition of the kitchen to a good standard and I must thank all those involved in this endeavour.

We are currently working on two significant projects to improve the running efficiency of the building and expand storage space.

With energy prices increasing, a study into the provision of solar array, air to air heat pumps and battery storage has been undertaken. Resulting in a viable and cost effective solution, that offers a considerable reduction in energy bills, and the potential to earn income selling excess energy back to the grid with a projected return on investment in under eight years. This work is predicated on the ability of the existing electric cable to handle the increase in power demands. It is planned to undertake an investigation in August this year with the aim of upgrading from a single to three phase supply.

A revised study is currently being undertaken to extend the existing storeroom to offer additional space for the hall’s table and chairs, along with increased cupboard space for the janitor and the stage and office equipment. Architectural plans have been drafted and planning approved. We now need to seek out costs to build and commission the extension, before we decide whether to proceed – based solely on price.

A Hive system has been installed to improve the heating in terms of timing and temperature in accordance with occupiers needs, all performed remotely. An improvement to reducing the attendance burden on committee members.

Doubled glazed windows that had ‘fogged’ have been replaced, elevating the physical appearance and condition of the hall. In this regard, we also plan to paint the exterior walls of the hall and kitchen.

The hall booking system is being elevated to a digital system, with an interactive spreadsheet that can be accessed by all committee members, eliminating cross booking and enabling better communication though the Hall WhatsApp group – which I believe is and shall be a considerable improvement as we move forward.

The project for the next year, is to utilise remote access to available booking times, coupled with introducing a paperless booking form on the Hall’s website. This along with a swipe card payment system should reduce the burden of processing booking availability and payment.

It leaves me to thank everyone for their support and involvement in both running and developing the hall over the last year. We still have a lot to do to meet our objectives of improving the building, it’s fabric and having a profitable energy efficient facility, but I am confident, with such a great group, we can do this!

Steve Burnage

Chair of Eaton Bray Village Hall Trustees.

24[th] July 2023