OpenCharities

This text was generated using OCR and may contain errors. Check the original PDF to see the document submitted to the regulator.

2025-03-31-accounts

www.kclweb.org

Registered Charity Number: 1162461

Chair’s Report

A report on behalf of the Trustees April 1[st] 2024 – March 31[st] 2025

This report has been prepared and submi1ed by the Chair of Trustees of Kegworth Community Library. The views expressed are those of the Chair and agreed with the other Trustees.

This report was authorised at the AGM on 6[th] June 2024.

1

Contents

Contents
Page Number Section Heading
2 Contents
3 Library Performance Overview
4 Library Performance
5 Our AcJviJes
6 Compliments / Complaints
6 Near Misses and Accidents
7 Volunteers
8 Financial Performance
9 Income GeneraJon
10 Risk Management
11 Progress Update
13 Future Plans
14 LCC Support
16 Property & Compliance
19 And Finally

2

Library Performance Overview

Kegworth Community Library (KCL) is a small library at the heart of the village. In February 2016 it reopened as a community managed library (CML) run by enthusiasJc and capable Trustees and volunteers.

Our Library opening hours are 2:00 – 4:30pm on Tuesday, Wednesday and Thursday. On Friday there is extended opening 2.00 – 6:00pm.

On Saturday mornings the library is open between 10:00am and 12 noon.

Library usage figures 1 April 2024 to 31 March 2025

This Year Last Year(2023-2024)
Scheduled open days in year 260 261
Assumes open every Tues-Sat unless it is a Bank-Holiday
Actual days open 253 251
(97.31%) (96.17%)
Library Visitor Numbers
Library 5598 4913
Knit and Na1er 301 328
Bingo 504 418
EmbarrasSing 318 327
Crae Club 219 186
Harsha Crae 102 0
Total Visitors 7042 6172

Our current resources are able to cover at least 3 years’ of running costs (assuming current expenditure and receiving no further income).

3

Fundraising efforts underpin our conJnuing success and the ‘Three Rings’ volunteer management applicaJon helps us to maintain our scheduling.

4

Library Performance

Annual Library Book Loans

For the year 2024 – 2025 (Figures taken from LCC Library StaJsJcs)

Current Year Previous Year Diference % increase
Book Issues 5777
New Joiners 171
AcVve Borrowers 391
Annual Visitors 4913
Talking Book issues 4

This is intenVonally blank as the figures supplied by Axiell are incorrect.

5

’ - KCL s Community AcVviVes 2024 2025

Our regular Bingo, Knit & Na1er, EmbarrasSing, and Crae Club, conJnued their support by meeJng in the Library.

Once again, we took part in the Summer Reading Challenge. This year’s Challenge a1racted 39 children enrolling and 22 being successful, medals being issued to children on compleJon. A cerJficate of compleJon was awarded to the parJcipants at their school assemblies.

School class visits conJnued with the children at Kegworth Primary School. The library opened over 4 mornings in October and February, to accommodate the school’s curriculum, with the majority of the school a1ending. The children were accompanied by their teachers to the library with each child being able to take out a library book.

Over the winter period our library, once again, opened as a ‘warm space’ to support local residents, with donated tea/coffee etc. from our local Co-operaJve store.

Our 4 Public computers, photocopying service and jigsaws hire/sales have conJnued to be used on a very regular basis overseenand maintained by a long term volunteer, thank you.

Fundraising led by the sale of ‘new to you’ books, conJnued here in the library, at all village events, the University of Nojngham’s Farmer’s Market plus Su1on Bonington Show and Rempstone Steam Fair. This takes a lot of hard work and effort and my thanks go to the fundraising trustee for this.

My thanks also to the team who run Bingo, EmbarrasSing & the upkeep of the gardens. The year on year (it has been 14 years) commitment has been immense.

6

Summary of Complaints / Compliments

We have not received any complaints over the year.

Summary of Public / Volunteer Accidents

There has been one reportable accidents/incidents to volunteers or visitors to the Library. No further acJon was needed and it was reported according to our policy and in the Accident Book.

7

Volunteers

As of the 31[st] March 2025, our volunteer numbers are consistent at 22, with an addiJonal 2 new volunteers undergoing training at this Jme.

Our ‘3Rings’ rota applicaJon allows us to keep in regular contact with all our volunteers for all things Library related. AddiJonally, our NoJceboards, Facebook page and website, also keep our community fully appraised of library acJviJes.

A core of volunteers, numbering 19, regularly contribute to the running of the library. A further 3 volunteers work Jrelessly in the background ensuring our conJnued success. Our volunteer demographic tends towards BriJsh, female and over reJrement age.

As Trustees, we do recognise that many groups, are underrepresented within our volunteer demographic and we welcome all applicaJons from anyone wishing to help run the library.

We also have a hardworking group who ensure the library is clean, Jdy and conform to Health & Safety regulaJons.

Our Treasurer, is also the person to call when help is needed and can be relied upon to appear almost immediately a major undertaking this year was the repainJng of the children’s area. Thank you.

Many of our volunteers can be called upon at short (or very short) noJce should problems suddenly arise.

8

Financial Performance

The Annual Return is a1ached as supplied to the ChariJes Commission form C116a.

Cash held on 31[st] March 2025 £23,480.51 Borrowings on 31[st] March 2025 £0.00 Capital Investments Plans None Staffing 0 Employees Financial PosiJon Excellent Warm Space (One Kegworth) £155.68 Kegworth Parish Council £0.00 North-West Leicestershire District Council All Council Tax charges waived

We are aware that we maintain a high cash balance with respect to our current account and aim to move 60% to an interest bearing account with Co-op bank.

9

Income GeneraVon

10

Risk Management

A review of risk is carried out regularly by a Trustee and plans / assessments updated as necessary.

Our problem Ash tree was ‘crowned’ and trimmed on the November 2023. Aeer review, it was felt that more branches required ‘trimming’. These concerns were raJfied by LCC and they were trimmed further.

The risk of the library being forced to close due to a lack of Trustees or volunteers is always present and has been bought sharply into focus this year. We have acJvely recruited and three volunteers are prepared to step forward.

As occupiers/managers of the library we are aware of our responsibiliJes for the safety of people in the library and under fire safety legislaJon (RRO 2005).

11

Progress Update on 2024/25 Plans

12

o These groups conJnue to support our library, for which KCL is very grateful.

✓ Renew the Library lease and support package for 10 years on the same (internally repairing only) terms as the current lease, which now has less than one year to run.

o It was agreed that our lease be renewed, and we sJll awaiJng LCC for the new Lease agreements.

13

– Future Plans April 2025 onwards

14

LCC Support

Premises

LCC are responsible for the external fabric of the building and grounds.

The grass and garden area are regularly maintained and KCL’s garden group conJnue to improve the appearance of the garden. The Ash tree to the right of the library conJnues to be assessed by LCC.

KCL’s building is old for the type of materials used and life expectancy of this type of construcJon.

The flat roof of the library conJnues to cause concern on at least two occasions water and other ma1er has cascaded over the roof. During the recent LCC renovaJons to the exterior it was noted by the contractors doing external Jmber repairs and redecoraJon, that the roof water exit pipes were approximately 1½” above the level of the flat roof. They esJmated, at that Jme, there was approximately 7000 litres of water on the roof, not draining away. LCC were appraised of the situaJon. The roof is scheduled for replacement during this year.

The window in the office was broken and repaired by LCC.

InformaVon and CommunicaVon Technology (ICT) and the Library Management System (LMS)

15

The LMS was replaced in February by Axiell. There have been a few teething problems and during the changeover we used a manual system.

Our hearselt thanks are extended to MM who conJnues to maintain the computers and a1ends quickly when we have problems.

Book Stock

We adhere to LCC guidelines for the book stock. A small group of volunteers work hard to ensure our books look neat and Jdy adding to the calm ambience in the library. The books are easy to browse as regular ediJng and audiJng takes place. KCL displays books a1racJvely and makes regular changes to invite browsing.

Hub Support (Loughborough)

Loughborough Hub conJnues to be the valuable help to our volunteers should the need arise. The staff there are always pleasant, supporJve and informaJve.

CML Support Officer

Our CML support officer is an excellent source of informaJon and support, answering our quesJons or queries.

AddiVonal Training

16

Training was cascaded down with the new soeware backed up with a comprehensive Help File. We are conJnuing to learn about the new system.

17

Property & Compliance

KCL conJnue to work with LCC to maintain and steadily improve the library both internally and externally.

ConJnuing Issues:-

Overhanging Ash tree branches conJnue to be a concern.

The flat roof which needs large scale repair/replacing. LCC are aware of our concerns and will program in maintenance in accordance with their Jmescale.

EICR Report has been referred to LCC as it raised several important issues.

Managing Risk and Compliance

Fire: Alarm TesVng & ExVnguisher

Electrical:

18

Water:

Emergency LighVng:

AutomaVc Door Servicing:

Other:

Asbestos: A thorough inspecJon and removal was carried out in October 2019 prior to the installaJon of the heaJng system and with the replacement of the sink and removal of the floor Jles (and adhesive) that contained asbestos, we now believe the library to be free of asbestos, though necessary tesJng will be carried out in advance of any further refurbishment work.

KCL have negoJated with NWLDC for the removal of waste.

19

KCL conJnue to buy back the following Soe FM from LCC:

LCC conJnue to provide basic grounds maintenance FOC under the terms of our lease.

KCL employs a cleaner to maintain the library’s day-to-day appearance.

20

Finally, from the Chair

This was an encouraging year, with many high points, although this is not to say there haven’t been challenges. This is shown by the rise in visitors and range of acJviJes. My sincere thanks go to the previous Chair and Secretary who stepped down from The Trustee group in April but conJnue as Lead Volunteers.

It’s really pleasing that 3 new volunteers are giving up some of their Jme to help the running of the library, however our core group of volunteers numbering 16 have been with us from the start. This is why we are successful, thousands of hours of donated Jme, resources and commitment. We rely on volunteers to run the library, many of them do so in the background. Andrew and I would like to thank my fellow Trustees, for the support and assistance given during the last year, for ensuring the library doors conJnue to be open, and to the community-based groups who use the library, not only affording financial support but also giving it a welcoming, friendly, and calm ambience.

Finally, finally my thanks to the Trustees, Hilary, Francis, Pat, Elain who give Jme, effort and money to maintain this brilliant atmosphere that is evident when you walk in the door of out library. Not one single person could do this on their own. Thank you.

Nicola Mullins

6[th] June 2025

Aiachments

C116a Financial Return for the ChariJes Commission

21

Charity Name Charity Name Charity Name Charity Name Charity Name No(if any) No(if any)
Receipts andpayments accounts
For the period
from
Period start date To Period end date
Section A Receipts and payments
Unrestricted
funds
Restricted funds Endowment
funds
Total funds
to the nearest £ to the nearest £ to the nearest £ to the nearest £
A1 Receipts
LCC Charges £250.76 - - 251
Book Sales £2,902.40 - - 2,902
Keg Pubs £232.50 - - 233
We Buy Books £200.09 - - 200
Sticker Books £59.60 - - 60
Drinks £503.10 - - 503
Stamps £313.85 - - 314
Printing £442.00 442
DVD £13.00 13
Jigsaw £335.00 335
Singing £833.16 833
Card Sale Commission £85.40 85
Internal Fund Raising £312.74 313
Knitwear £373.00 373
Room Hire £1,730.50 1,731
Misc £27.00 27
Donations £966.33 966
External Fund Raising £495.47 495
Grants £0.00 -
Bingo £706.01 706
Calendar £53.00 53
- 0 -
Sub total_(Gross income for AR) _
10,835
- - 10,835
A2 Asset and investment sales,
(see table).
- 0 - 0 - 0 -
- 0 - 0 - 0 -
Sub total
- 0
- 0 - 0 -
**Total receipts **
10,835
- 0 - 0 10,835
A3 Payments
Utilities £3,104.94 - - 3,105
Building Security £2,564.09 - - 2,564
Building Maintenance £647.04 647
Cleaning £817.11 - - 817
Comp-uting £291.90 - - 292
Expenses £154.30 - - 154
Postage stamps £227.71 228
Printer + Paper £154.71 - - 155
Gardening £84.43 84
Xero & SumUp £188.32 - - 188
Sticker books £9.60 10
MISC Invoice £233.30 - - 233
- 0 - - -
**Sub total **
8,477
- - 8,477
A4 Asset and investment
purchases,(see table)
- 0 - 0 - 0 -
- 0 - 0 - 0 -
**Sub total **
- 0
- 0 - 0 -

CCXX R1 accounts (SS)

14/11/2025

1

**Totalpayments **
8,477
- 0 - 0 8,477
**Net of receipts/(payments) **
2,357
- - 2,357
A5 Transfers between funds - 0 - - -
A6 Cash funds lastyear end 21,193 - - 21,193
**Cash funds thisyear end **
23,550
- - 23,550
Section B Statement of assets and liabilities at the end of the period
Categories Details Unrestricted
funds
Restricted funds
to nearest £ to nearest £
B1 Cash funds Co-op Bank 01/04/2025 23,481 -
Cash in Hand 70 -
- -
Total cash funds 23,551 -
(agree balances with receipts and payments
account(s))
Agreement Error
Unrestricted
funds
Restricted funds
Details to nearest £ to nearest £
B2 Other monetary assets Postage stamps 50 -
Sticker book stock 28 -
Book shop stock 295 -
Jigsaw Stock 55 -
Toner Stock 225
Light Fittings Stock 120
Furniture & fixtures 463 -
Soft Furniture & office Equipment 133
Computing Equipment 473 -
Total 1842
Details Fund to which asset
belongs
Cost (optional)
B3 Investment assets None -
-
-
-
-
Details Fund to which asset
belongs
Cost (optional)
B4 Assets retained for the
charity’s own use
-
-
-
-
-
-
-
-
-
**Totalpayments **
8,477
- 0 - 0 8,477
**Net of receipts/(payments) **
2,357
- - 2,357
A5 Transfers between funds - 0 - - -
A6 Cash funds lastyear end 21,193 - - 21,193
**Cash funds thisyear end **
23,550
- - 23,550
Section B Statement of assets and liabilities at the end of the period
Categories Details Unrestricted
funds
Restricted funds
to nearest £ to nearest £
B1 Cash funds Co-op Bank 01/04/2025 23,481 -
Cash in Hand 70 -
- -
Total cash funds 23,551 -
(agree balances with receipts and payments
account(s))
Agreement Error
Unrestricted
funds
Restricted funds
Details to nearest £ to nearest £
B2 Other monetary assets Postage stamps 50 -
Sticker book stock 28 -
Book shop stock 295 -
Jigsaw Stock 55 -
Toner Stock 225
Light Fittings Stock 120
Furniture & fixtures 463 -
Soft Furniture & office Equipment 133
Computing Equipment 473 -
Total 1842
Details Fund to which asset
belongs
Cost (optional)
B3 Investment assets None -
-
-
-
-
Details Fund to which asset
belongs
Cost (optional)
B4 Assets retained for the
charity’s own use
-
-
-
-
-
-
-
-
-

CCXX R2 accounts (SS)

14/11/2025

2

Details Details Details Fund to which
liability relates
Amount due
(optional)
B5 Liabilities -
-
-
-
-
Signed by one or two trustees on behalf
of all the trustees
Signature Print Name
N J Mullins

CCXX R3 accounts (SS)

14/11/2025

3

CC16a

Last year to the nearest £ £291.76 £2,412.35 £180.00 £217.55 £74.20 £281.50 £285.01 £335.95 £184.00 £817.00 £99.00 £68.00 £578.00 £810.00 £0.00 £994.14 £71.00 £2,616.33 £523.16 £5.00 10,844 - 0 - 0 10,844 £3,287.36 £2,054.89 £3,109.25 £779.34 £1,120.50 £198.35 £303.97 £131.08 £10.98 £174.14 £57.49 £661.32 11,889 - 0

CCXX R4 accounts (SS)

14/11/2025

4

11,889 - 1,045 - 22,238 21,193 Endowment funds to nearest £ - - - - OK Endowment funds to nearest £ - - - - - - Current value (optional) - - - - - Current value (optional) - - - - - - - - -

CCXX R5 accounts (SS)

14/11/2025

5

----- Start of picture text -----
When due
(optional)
Date of approval
06/06/2025
----- End of picture text -----

CCXX R6 accounts (SS)

14/11/2025

6