APPENDIX 1
Other optlonal infomiatlon
Declaration
The trustees declare that they have approved the trustees, report above.
Signed on behalf of the charity's trustees
Signature(s)
Full name(s)
Posltlon (e.g. Chalr)
Date
20/ID/2¥

Crossmlchael Communlty Trust
Receipts and payments accounts
SC10
OSCR
For the peflod
Scotlish Charity Re8ulatt
2024
01
2023
June
Section A Statement of recelpts and payments 4*.,"
Permanent
endowment
funds
Unrpstrlcted
funds
Restricted
fund8
Expendable
endowment
funds
Totsl fundg
current period
Totsl fundg last
period
to n•af••t £
to n•af•s¢ £
to n•arn¢ £
A1 Recei
1,865
1.865
Legacies
Gr8nts
Receipts frDm fundraising activities
Gross trading re￿iptS
Income frcxn Investments ott￿r than
land arKI buildings
Rents frcxn land & buddings
Gross receipts from other dwntable
ath'vrties
1008
1008
550
A1 Sub total
3,873
3,873
2.397
A2 Receipts from asset &
Investment sales
Proceeds fr(xn sale of ￿ed assets
A2 Sub total
Totsl recwpts
3,873
3,873
2.397
A3 Payments
3,394
27
Investment management costs
Payments relats.ng directly to d￿ntable
actNities
Grants and donations
Governance CL)sts:
Audrt l lrKj￿￿Ient examinati(
PreparatKXI of annual
Legal (x)sts
300
300
Property purchase legal costs
A3 Sub total
4,374
4.374
27
M Payments relating to asset and
Investment movements
10
PUrd￿se of investments
A4 Sub total
Z£Z£4
10
Total payments
4,374
4.374
37
(501)
2,360
A5 Trnnsfern to l (from) funds
sU￿lUs / (deficit) for year
501
($01
2,360

Statement of balan¢Ès&,Xv ,.
ommunl
Trust
V4eL
Catègorlès
sh lunds
SC10
Det4113
Cath ba* bal•w at ye*
Swphjsl (defi￿) slM)hn m rec*OS
T¢A•l Iw p•rforf
3.537
1501)
3,S37
(501)
Cash arKI bank balances at •nd of y•ar
3,036
nvèskn)ents
Dètallg
Detalls
Other assets
FWKI to ¥•hkh ass•t b•l¢x
Land at Crossmichael Marina
Old He&se House, Crossmichael
CrossmKhael MeffKYial Hall
Imt£
Unrestrided
10
Tcrtal
11
75.000
75,000
Detalls
Llabllitles
to n•ar•st £
to Marnst £
Detalls
B5 Contingent liabilltSes
tr• Marnst £
Slgn•d by on• or two tn￿t￿8
Slgnature
Prlnt Namo
Jte

DIX2
C￿3m1¢ha•l Cominunlty Trust
Notes to the Accouiits
nd Ixirpoi• oi ¢ .' .
bo st*ed thi¢,,
8CI0
Type of actlvity or project supported
Tolal
rustse roliiurieratlon
If no remunerakn vras pald during tr* perlod to any charity trustee CK pers(xi cmded to a
trustee cross thh box (otsrvase c￿np*￿ section 3b)
Authorlty undor whlch paid*.'
Trustse exiienses. .
If no expenses were pakl to any charity trustee durlw ts period then cross thls box
(thrwtse complete section 4b).'
Ils
Nature of relationshl
Nature of transaction
d connected p•r•oM "'
1) l•¥J d Crossth M•kna18 apwox 348m2 aKI tt) the TnAI al CO* ￿ 1&h
March 2016. Tlws laTrl is c(Thklered to have fffnited use. other trwi tr pafklfYJ aThJ has an estimated vakn of
2019 a rmxnwwl £1. Pri(x to ttM8, offers for the Im￿l￿a of£4,5(NJ we by
Hal from the CrossmKhael C(xnmunity Hall Tfust a Mminal £10 as part of a wogramme of t
managen*rt aNI of ts Crossmichael ￿llage C(xnm￿Ity activits8, fwKI raisivj asset
1￿h Mwth 2024 vAh a Market Vak* d £70,(YJO. 4} As at 3(Xh 2024, bal￿ £3029.35. cash kn ,
haNI £7.43

NL)IX 2
Crossmlchael Community Trust
SC10
Additional analysis (1)
Analysls of r•celpts and payments
1 Donatlons
Expthlabl•
3Crt)
1,290
Other
275
275
1,865
1W7
Total
2 Grants
Toial cwrn*
flindq
n••rn•t £
•a£ ££
Total
3 Gross recelpts from other charitsble actlvltles
Totsl currn
funds
Memonal Hall and equipment hire
2,008
Totsl
4 Payments relatlng dlrecty to charltsble actlvltles
Total last P•fk>d
lunds
10 Tr••rn6t £
ManlenaiKe, insW￿, upkeep of Memorlal Hall
3,394
3.394
LwJal costs Fxrthase d Memorla Hal
VauatKXI Hall
300
Totsl
4,374
1374

SC10
5 Brn•kd¢)wn ol unrestrict•d funds
nf
r)
lund l - •nlDf
naJn• of tun
(Jftr•%tnÉt•d
Ivnd 2 - orrt*f
fflo ol lurN1
bplow
Unrn>tfl¢tod
Unrn•tfl¢*d
rbd 4 . ont•
I fvntl
narnv ot I
lj¢lf)W
T(rtal
Rocelpts
Donations
1.865
1.847
Gross Irwji
txnldi
Rents from I&KJ &
recoipts
Sub totsl
3.8n
3,873
1397
Prcteeds frixn sale fixed assets
Prcreeds frcrtn &￿e of mveslm
Sub total
Total rncelpts
3.8n
J.S73
2.397
nts
3,394
3.394
Investrwrt managemenl costs
Payywits relalry diredly to acti￿1)83
Grants arnl (kxkngticms
preparati￿ of 8nnual
Legal costs
Property sxffdw legal costs
Sub total
4.374
4374
Payments r•latln9 to as8•t and In¥•stThnl
movem•nt•
P￿d￿Se$ of f￿ad assets
Purthase d U)ves1n￿￿S
10
..Z4aZZ4
10
4374
4374
37
($01)
2,360
Transl•ro to l (trom) lunds
sU￿lUs / (d•fkW for y•ar
15011
$01)
Natur• Ind
ol funds
•wisrtm ol CrosMX￿ Hall ￿ 71h j￿ 2Q3, the Trust tArnfilod from hall hlrn irK(yDe d £2CX)8 dunng the yew pAiryJ 301h 2024,
¥fith ¢*xwtKTh Icx tho yow 01 £1 W TINry m•rteIw￿, fv, njrnry costs ftx the H811 totalled £3394. legal cosls relat¥vJ lo
vahjthi £X(I (J8IKat the YW of £S)1. to strwlwal Is$￿ ￿1h Hall
was c*wJ (m 7th 2024 shall rwn so
eswt

Py
CroMml¢ha•l Communlty Tr￿1
SC10 ,
Additional aiialysis (3}
Restr"Icttd fvndaJ•", Restsidod lund ty.: Rojtrictsd l(ma Rosiri¢tad tund ' .
l . tftlor nam• 01 2 .•ntvr name ¢1,:
. gntgrnim• al 4 ••ntsf nifim ol_.
fund t•low
fund bolow
fund b4low
. fvfjd b•lty .,,
Ir
sl
&) l (kn) frJrA

APPENDIX 3
OSCR
Scottth Chanty Regulator
Independent examiner's report on the accounts
Report to the Chanty name
trusteeslmembers of Crossmichael Community Trust
Registered charity SC10
number I
On the accounts of the
charity for the period .
01
Period stsrt date
Month
Period end date
Month
June
Day
Year
2023
Day
Year
to
30
2024
Set out on pages
1.2.3,4.5,6
jrememtw to Indude the page
Respective The chanty's trustees are responsible for the preparation of the accounts in accordance
responsibilities of with the terms of the Charities and Trustee Investment (Scotland) 2005 Act and the
trustees and examiner Charities Accounts (Scotland) Regulations 2006. The charity trustees consider that the
audit requirement of Regulab'on 10(1) (d) of the Accounts Regulations does not apply. It
is my responsibility to examine the accounts as required under secbon 44(1) (c) of the
Act and to state whether particular matters have come to my attention.
Basis of independent My examination is carried out in accordance with Regulation 11 of the Charities
examinerfs statement Accounts (Scotland) Regulations 2006. An examination includes a review of the
accounting records kept by the charity and a comparison of the accounts presented with
those records. It also includes consideration of any unusual items or disclosures in the
accounts and seeks explanations from the trustees concerning any such matters. The
procedures undertaken do not provide all the evidence that would be required in an audit
and, consequently, I do not express an audit opinion on the accounts.
Independent examiner's
statement In the course of my examination, no matter has come to my attention
which gives me reasonable cause to believe that in any material respect the
requirements:
to keep accounting records in accordance with section 44(1) (a) of the 2005 Act and
Regulation 4 of the 2006 Accounts Regulations, and
to prepare accounts which accord with the accounting records and comply with
Regulation 9 of the 2006 Accounts Regulations
have not been met
Signed:
Name:
Relevant professional
qualification(s) or body
(rf any):
Date:
24/01/2025
Address:
'Please delete the words in the brackets if they do not apply If the words do apply, set out those matters which have come to your attention on the
following page.

isclosuré section.:
Qlve here brief details of
any items that the
examiner wishes to
disclose
Only complete rf the examiner needs to high1￿ht material problems.

¢1?
KIEIEIEIEIEIUEaEIEIEIUEaEIEIEauEIBEIEIEIUEIEI

••
EIEaEaEIB￿￿EaEak1￿f3BE11]Eg£1E1fjuEl

CA)
lll
E3EJfaEIEaEaEaEaEaEIEaEaEaEa
••

## **Crossmichael Community Trust SCIO (Charity No. SCO45747)** 


The Community Trust’s year started off very promisingly starting on a high with the official hand over in to Trust ownership of the Memorial Hall at the very end of the previous session. The event was very well attended by people of all ages and representatives from groups and organisations which work in and support all aspects of the community. In the spirit of inclusion everyone that attended helped cut the ribbon. 

The year progressed well and our other assets of the field by the river and the Hearse House continued to be maintained and run by volunteers and the village’s Heritage Group. The open space by the river was used extensively by boaters and open water swimmers and the major event was the Beltie Triathlon in the second weekend of September. This was very well attended by both participants and spectators across both days of the weekend. The villages Dee Dip on January 1[st] also had an excellent turn out. 

The Hearse House was again open on a daily basis up until October, and re-opening for Easter at the start of the tourist season. It continues to attract interest from both locals and visitors leading to a bigger footfall at the main Heritage Centre in the Church Hall during its weekly summer openings. The Heritage Group continue to expand their offering  and it is hoped they will continue to thrive and grow. 

Bookings began to increase for the Memorial Hall both in regular repeat groups and ad hoc one off events. A New Year party organised by the village pub was a huge success, well attended and much appreciated by the community, so much so it is hoped this could become an annual event on the village calendar. 

Our Secretary, made extensive efforts throughout the year to attract grant support from Scottish Power Energy Network’s (SPEN) Transmission Net Zero Fund to upgrade the Memorial Hall’s insulation and heating system. The application process proved to be very involved and onerous and even with the assistance of specialists and local agency support our initial application was turned down. Due to 

tenacity and great effort we were invited to tender for a second round of the Fund which we did. Unfortunately, in May of 2024, even though we appeared to 



be on the cusp of being awarded a grant in the region of £100,000 we had to withdraw our application at the last moment. 

This was due to discovering a most unexpected and unwelcome structural flaw in the fabric of the Hall which meant the planned improvements would be pointless. A relatively minor issue of flooding under the stage lead to the discovery of extensive rot and water damage to the beams under the floor of the body of the Hall. This was a huge surprise as the floor surface had been replaced and the beams under it repaired as recently as 2019 by the previous Board. 

It appears that between the repairs to the floor and subsequent remedial work on drainage at the rear of the building which had delayed the handover of the Hall to the Trust, an issue of water ingress leading to damage of the floor beams had occurred but gone completely unnoticed. A structural survey was arranged in short order which reported that the floor was so badly waterlogged and weakened that it was not safe to use. On being made aware of this the Hall was closed and all bookings cancelled with immediate effect. 

This has had a devastating effect on the Hall as it is currently, and for the foreseeable future, unavailable for community use. The first casualty of this was the village schools end of year show which was a huge disappointment for all involved. It has also created a black hole in the Community Trusts funds  as at the same time that it cannot generate any income the Hall still has on-going overheads which will quickly drain our limited financial reserves. 

Thankfully there already appears to be at least one up-side to this desperate situation. Across the board members of the community have expressed their support to save the Hall everyone having a story to tell of its significance to them and of happy times they have had there. 

There is a great deal of work ahead but it is hoped that the Trust, with the community behind them, will be able to rise to the challenge and can rescue the Hall we are all so proud of. 

, Chairman, Crossmichael Community Trust SCIO, SCO45747 June 2023 – June 2024 



-APPENDIX 1
oscr
Peric#J stsrt date
Period end date
M(xrth Y88r
Month Year
From
To
01
07
2023
2024
offi￿ of the Seottish Charity Regulator
Reference and administration details
Charity name
other names charity is known
Crossmichael Communty Tnjst
Registered charity number
Charity's principal address
SC 045747
63 Main Street
crossmich￿l
Casle Douglas
KirkcudbrMJhtshire
Postcode DG73AU
Names of the charty trustees on date of approval of Trustees. Annual Report
Trnstee name
Office (if any)
Dates acted rf
not for whole year
Name of per￿
lor body) entitled to
trusts¢ Of any)
Chaim)an
Vice Chair
Secretary
Treasurer
10
11
12
13
14
15
16

17
18
19
20
APPENDIX 1
Reference and administration details
Names of all other charity trustees during the period. if any. (for example, those who resigned part way
through the financial period)
ame
Resigned 29112123
structure, governance and management
Type of governing document
Two tier constituti(ffi.
Trustee recruitment and appointment During this finanaal pericrtl 1 of our Trustees stth)d down. All of the Office
Bearers have expressed their intent to leave the roles at the next AGM ane
replacefflents are being actively sought from the both the Board and wider
membership.
Objectives and activities
Charitable purpose5
1. To advance the environmental prOteCt￿n and improvement of land at tht
riverside in Crossmi¢hael and adjacent to the Marina.
2.To advance community development where appropriate Mqthin
Crossmichael for the benefits of the residents of Crossmichael.
3.The provision of re¢xeational faulities, or the organisation of recreational
activrties with the object of improving the conditions of life for the persons

|**Summary of the main activities**<br>**in relation to these objects**|1. Continue to support the use of the riverside field for events and sporting<br>activity and general community use and encouraging volunteers in the<br>maintenance, (grass and hedge cutting), of the site.<br>2. Working in partnership with the local Heritage Group to open and close<br>the Hearse House part of the Heritage Centre on a daily basis though out<br>the summer to encourage greater resident and visitor footfall to the main<br>part of the exhibition.<br>3. i) Working to encourage increased use of the Memorial Hall by both<br>community and external groups through better advertising and on-line<br>booking and payment systems.<br>ii) Ongoing efforts to draw down grant funding to up-grade the Hall’s<br>insulation and heating system to modern net zero standards.<br>iii) Extensive community involvement to deal with closure of the Hall on<br>discovery of catastrophic structural failure of main floor in the building.|
|---|---|



## **APPENDIX 1** 

## **Achievements and performance** 

**2** 




**----- Start of picture text -----**<br>
Summary of  The Community Trust’s year started off very promisingly starting on a high with the well attende<br>the main  official hand over in to Trust ownership of the Memorial Hall at the very end of the previous session.<br>achievements  The year progressed well and our other assets of the field by the river and the Hearse Hous<br>of the charity  continued to be maintained and run by volunteers and the village’s Heritage Group. The open spac<br>during the  by the river was used extensively by boaters and open water swimmers and the major event was th<br>financial  Beltie Triathlon in the second weekend of September. This was very well attended by both participant<br>period and spectators across both days of the weekend. The villages Dee Dip on January 1 [st]  also had a<br>excellent turn out.<br>The Hearse House was again open on a daily basis up until October, and re-opening for Easter at th<br>start of the tourist season. It continues to attract interest from both locals and visitors leading to<br>bigger footfall at the main Heritage Centre in the Church Hall during its weekly summer openings. Th<br>Heritage Group continue to expand their offering  and it is hoped they will continue to thrive and grow.<br>Bookings began to increase for the Memorial Hall both in regular repeat groups and ad hoc one o<br>events. A New Year party organised by the village pub was a huge success, well attended and muc<br>appreciated by the community, so much so it is hoped this could become an annual event on th<br>village calendar.<br>Our Secretary,  , made extensive efforts throughout the year to attract grant support from<br>Scottish Power Energy Network’s (SPEN) Transmission Net Zero Fund to upgrade the Memorial Hall’<br>insulation and heating system. The application process proved to be very involved and onerous an<br>even with the assistance of specialists and local agency support our initial application was turne<br>down. Due to Mrs Gell’s tenacity and great effort we were invited to tender for a second round of th<br>Fund which we did. Unfortunately, in May of 2024, even though we appeared to be on the cusp o<br>being awarded a grant in the region of £100,000 we had to withdraw our application at the las<br>moment.<br>This was due to discovering a most unexpected and unwelcome structural flaw in the fabric of the Ha<br>which meant the planned improvements would be pointless. A relatively minor issue of flooding unde<br>the stage lead to the discovery of extensive rot and water damage to the beams under the floor of th<br>body of the Hall. This was a huge surprise as the floor surface had been replaced and the beams unde<br>it repaired as recently as 2019 by the previous Board.<br>It appears that between the repairs to the floor and subsequent remedial work on drainage at the rea<br>of the building which had delayed the handover of the Hall to the Trust, an issue of water ingres<br>leading to damage of the floor beams had occurred but gone completely unnoticed. A structural surve<br>was arranged in short order which reported that the floor was so badly waterlogged and weakene<br>that it was not safe to use. On being made aware of this the Hall was closed and all booking<br>cancelled with immediate effect.<br>This has had a devastating effect on the Hall as it is currently, and for the foreseeable future<br>unavailable for community use. The first casualty of this was the village schools end of year show<br>which was a huge disappointment for all involved. It has also created a black hole in the Communit<br>Trusts funds  as at the same time that it cannot generate any income the Hall still has on-goin<br>overheads which will quickly drain our limited financial reserves.<br>Thankfully there already appears to be at least one up-side to this desperate situation. Across th<br>board members of the community have expressed their support to save the Hall, everyone having<br>story to tell of its significance to them and of happy times they have had there.<br>There is a great deal of work ahead but it is hoped that the Trust, with the community behind them, w<br>be able to rise to the challenge and can rescue the Hall we are all so proud of.<br>**----- End of picture text -----**<br>


## **Financial review** 

|**Brief statement of the charity’s policy**<br>**on reserves**|<br>Having started the year with great optimism that our new asset of the<br>Memorial Hall would be able to generate funds for our Trust our plans have<br>now been thrown in to disarray by the discovery of the structural flaws in the<br>building. Instead of being our main financial asset it has turned it into a huge<br>burden on our reserves and limited income. Currently the Trust has enough<br>savings to cover the ongoing overheads incurred by the Hall for the coming<br>year. However, resolving this issue will be the prime objective for the Board<br>going forward  but until it is the hope of building up any reserves will be<br>greatlyrestricted.|
|---|---|
|**Details of any deficit**|We are currently in the black financially and with enough reserves to cover<br>our costs for the coming year.|





**Donated facilities and services (if** i) The Trust donated the use of tables for a local Gardens Open event and in **any)** return were rewarded in turn with a financial donation of £1290 which was very gratefully received. ii) Organisers of the Beltie Triathlon made a payment by donation of £300 for use of the Trust ground by the river which was also much appreciated. iii) Volunteers and Trust members continue to maintain the grass and hedges at the riverside; many thanks to them. 

**3** 

