Sandhutton and Breckenbrou
h Villa
e Hall
Income and Ex
ndlturp Stateme
S tts 31st Mai
Jgfo
T*Kkfof RXO
C￿￿84t111AWq 2D2J
is5.
972489
IHT2
2sJ4
IGIO UwdcarpaTk
2815.00
110.00
Nl4hlS
Ra¢e Nights
RK• n*ht2D2B
538.00
798.00
-125.00
481.QO
22J
35F
CurryNkJK Ch•e
f07J n*ht170* ￿￿￿&181n￿ums￿yOl￿rlPHI1o￿n
1209.50
3S.00
2881
63
and Gi*its
19650.00
30231.00
1M7JlB
1SXO8
246.82
wr4D¢•
4122
14184
f?TS ￿d￿v￿orkIN•lTrIl￿￿￿*
5592.01.
669.65
81.
124 Fk•EqulFTh•ntl Pe*tC(•tt￿1P1r￿A￿
tg6
tJue4n*g¢th Wr￿lY
036.34
148 Tiblvs.K•y$rt￿￿r,pUSt bjx
105.15
Com￿•J￿￿F1rjE
AVWthblg B•nk bJknr•a*al J1.0
CMhYJllh L￿￿tr
#1.0318
shln
31.03
lo￿17
113D
F￿110r1￿rS￿J￿•m￿l Pum
1#tyxo0 2837$.84 '
6W29
& %£q4S.17
36231.66

**Chairmans Report 2025-2026** 

**I would like to thank Les for mostly writing this report which he gave to the Parish Council at the beginning of May 2026.** 

1. Refurbishment and future projects 

During 25/26 the biggest challenge has been keeping the village hall warm for users. Both the south and north windows have been replaced with modern double-glazed units – many thanks to the Parish Council for funding from their CILs fund. This has reduced some serious drafts from the previous ill-fitting windows. 

Installation of two (interim solution) smart electric heaters (2 x 2kW) to provide background heating in the hall and augment the IR (meter based, very expensive) heaters. 

New roller blinds – these were required due to the removal of the suspended ceiling and proved very effective at last race night. 

Planned 26/27 – further heating and energy efficiency projects, this project started in mid 2025 and is on going:- 

Air source heat pump and radiators. We now have funding in place to cover the £11,740 cost of a 16kwH heat pump and £4,850 for the associated plumbing and radiators. These have been specified to heat the VH to 20C in an hour from a background level. It is hoped to place the order this month. 

Solar panels with battery storage and the ability to run as an island system in the event of a power cut. This should generate some income in the summer months and reduce electric bills in the colder months. Our last electric bill was £1,142, so there is some urgency fundraising to raise the £13,520 required. 

Many thanks to John for his tireless efforts applying for grants and supporting VH fundraising events. He will update with where we are at. 

Painting exterior woodwork – arranged in August 2025 has now been done. 

2. Usage 

The VH usage has increased (many thanks to the hard work of Lynne Moorhouse) and includes many regular bookings, social functions and private parties: 

Groups – sewing, gardening, African drumming, book club, children’s arts and crafts, chair yoga, evening yoga, bridge club (due to start), band rehearsals. 

Functions – two very successful race nights (last one raised over £1,500 split between the VH and church, Saltburn Smugglers, Halloween party, Mexican night, Prosecco afternoons, N Yorkshire produce evening (church function), monthly Pizza nights, coffee and sausage bap mornings (thanks Jim and Lynne), Christmas Craft Workshop, Craft Fayre. 

Lynne will no doubt mention the future events. 

3. Technology 

WiFi installed – free use for all VH users. This allowed control of the smart heaters and air source system 

Active Facebook page advertising all events (thanks to Iona) – please visit to see photos of past events. 

VH – website and registered domain name (sanhuttonvillagehall.org.uk). The website has all VH policies and contacts with forwarding email addresses. This was set up for £1, and hosted by GIThub (free for registered charities) (thanks Rob Anderson for building the website) 

4. The VH joined Community First Yorkshire – they advise and advertise funding/grants, Village Green have conducted an energy survey and provide contact details for similar organisations 

5. One big challenge during the last year was to write and post our policies, this has been done and are available to read on our website. Thanks to everyone involved in this for your time and effort. 

