Leigh and Bransford Memorial Hall and Recreation Ground 

Sherridge Road, Leigh Sinton, Malvern, WR13 5DE 

## **Leigh and Bransford Memorial Hall Committee of Trustees** 

## **ANNUAL REPORT 2024-25** 

## **MARCH 2024 – FEBRUARY 2025:** 

## **A YEAR WHERE BOOKINGS INCREASE BUT SO DO OUR OVERHEADS – BUT NEVERTHELESS A POSITIVE YEAR** 

## **INTRODUCTION** 

One of the benefits of looking back over previous reports together with sound record keeping is the point of reference they can give as we look forward to identifying our hopes, ambitions (and sometimes fears) for the year(s) ahead. 

The annual report for 2022-23) was characterised by a period of prolonged and exponential rises in inflation.  Soaring inflation, like the pandemic before it, if not strategically addressed, would have posed a serious threat to our Hall’s short and long-term financial viability.  In the event we were able to stabilise  the potential threat and impact of our rapidly  rising overheads  and, as  that year progressed, the trustees managed to re-set our financial strategy to create a sustainable platform for the future, which we then described as our “new normal”. 

Last year’s annual report (2023-24) reflected on what turned out to be our first full year experiencing this “new normal” – a year when, thanks to the determined effort of all our trustees, we were able to consolidate,  and slightly  improve, the relatively  healthy financial position we had managed to achieve by the end of the previous year. 

And so, to the year just ended – 2024-25 – which also marks the 105th anniversary of the opening of the Memorial Hall on January 20, 1920. Although much has changed since those early days, what hasn’t changed is the mission of the charity, set by our founding trustees 105 years ago. Their original purpose statement is clear about how the hall and its grounds should be managed 

“in the interests of social welfare, to improve the conditions of life . . . . without distinction of political, religious or other opinions by the provision of facilities for recreation and other leisure-time occupation.” 

As trustees our over-arching objective each year is to uphold those values which, in practical terms, is reflected in our published pledge to “maintain and improve the Hall, its grounds and 

1 of 9 



facilities as a financially viable and welcoming safe place for all hirers and their guests to use and enjoy”. 

So, how did we do last year? Here are the headlines. 

## **LAST YEAR’S HEADLINES** 

- In total bookings last year were up by 12%.  That translates as 376 bookings or slightly more than one a day throughout the year. Included in that number were 8 weddings – 5 more than the previous year 

- Our financial viability goes from strength to strength. Last year our accounts showed a net positive balance of income over expenditure of almost 15% while maintaining a rolling reserve in excess of £25,000.00 

- We had, however, initially expected to generate a larger surplus than this, but as the months  progressed,  we  experienced  higher  than  average  emergency  maintenance issues. This meant we had to increase our contingency budget to cover those additional costs.  Inevitably that also meant we had less to spend on planned improvements and replacement of old equipment 

- Despite  having  to  allocate  more  of  our  annual  surplus  to  cover  those  unplanned maintenance costs, we were still able to purchase new furniture (tables and chairs) and achieve some re-decoration in the Small Hall 

- Our end-of-year carry forward surplus (taking account of maintaining our rolling reserve) is being used to purchase a new CCTV hard-drive and to replace the industrial oven and microwave in the kitchen 

- Additional prioritised improvements for the (2025-26) year ahead were also identified – these will be implemented as and when funds become available. 

## **OUR OBJECTIVES FOR 2024-25** 

Our two, over-arching objectives for 2024-25 were, as in the previous year, very straight forward and served us well as both strategic and tactical priorities.  They were: 

- To maintain an environment that would give hirers a good, value-for-money experience 

- To improve and sustain the Hall’s continuing financial stability and security 

- To implement an agreed schedule of improvements to the Hall and its amenities as finances allowed. 

2 of 9 



## **HOW DID WE DO?** 

## **MEASURING SUCCESS: OBJECTIVE 1** 

## **To maintain an environment that would give hirers a good, value-for-money experience** 

As in previous years we triangulated our measurement of success against this objective by asking ourselves whether: 

- our rates continue to be competitive 

- we are ensuring that the building and grounds are clean and safe, and its facilities 

- continue to be in keeping with hirers’ expectations, and 

- whether the number of hires per year is decreasing, increasing, or holding steady 

## **Are our hourly rates competitive?** 

We had previously undertaken an analysis of the advertised rates for hiring village or community halls in the surrounding area.  A like-for-like comparison is not straight forward as the Leigh and Bransford Memorial Hall is the largest community space available for hire and so we would expect our rates to be generally higher than the other halls.  But that was not always the case. It is also interesting to see how others advertise their rates – for some halls the hirer needs to book the kitchen  space  separately  whereas  our  business  model  always  includes  the  use  of  the  fully equipped kitchen with crockery, cutlery, glasses and so forth, together with use of any of the tables and chairs we keep in our furniture store. 

Many of the surrounding halls also require a deposit of between £50.00 to £100.00 – we, on the other  hand  abandoned  this  practice  some  years  ago  as  it  was  costly  and  cumbersome  to administer.   We  now  require  all  hirers  to  acknowledge  their  acceptance  of  our  Terms  and Conditions at the point of hire, which gives us the ability to require additional payment for damages or failure to leave the building in an acceptable manner. 

All that said, and allowing for the annual inflation-linked rate increase on 1 March 2024, our hire rates are broadly comparable with other local halls and similar public venues. 

This analysis when contextualised against year-on-year hire numbers (see below) suggests that our hourly rates are set within market expectations – or to put it another way, what the current market will bear. 

## **Are we ensuring that the building and grounds are clean and safe and its facilities in keeping with hirers’ expectations?** 

3 of 9 



In order to keep our overheads manageable, our Terms and Conditions require all our hirers to work through an End of Hire Checklist before finally leaving the building. we have a self-clean and tidy away system with which all hirers must comply.  This checklist requires hirers to clean up and clear away at hire end to ensure that the building is left clean and tidy for those that follow. Failure to comply may trigger an additional payment from them. 

We also employ the weekly services of a professional cleaner, which in 2024-25 was our second largest overhead, next to our energy costs, accounting for almost 19% of our planned operating expenses. 

Every year we also endeavour to update our facilities in line with hirers’ expectations and the 202425 year was no exception – despite unusually high extraordinary unplanned maintenance costs.  A more detailed list of improvements and other works is given later in this report under the review of our third objective. 

## **Are the number of hires per year decreasing, increasing, or holding steady?** 

We constantly monitor the number of hires being booked over the course of each year, as the raw data helps to give us a year-on-year comparison of activity.  But the number of hires on their own needs further triangulation to determine more meaningfully how we’re doing. 

For example, we categorise our hires into three groups, namely the number of hires booked by our regular weekly or monthly groups; so-called ‘one-off’ hires (although these can also be ‘repeat business’ hires; and wedding or other weekend bookings more than 12 hours). We then look at the revenue generated by the regular hires compared to the one-off hires and weddings etc.  In any one year, these 3 data sets will vary so it is important also to know the income generated by these different groups. 

In  2023-24  we  reported  that  while  the  total  number  of  hires  (before  taking  into  account cancellations) fell by just over 7% compared with the previous year – 336 hires compared to 364 hires – gross income from all hires was actually up on the previous year. 

In the year just ended the actual gross number of hires increased to 376, which is better than both the  previous  years.  Year-on-year  hires  were  up  by  almost  12%  and  our  hire  income  also correspondingly rose by just under 10%.  The two-year gross average number of hires is now 356. 

Hires  by  our  regular  groups  (excluding  ground  rent,  fund-raising,  grants  and  payments  from recycling textiles collections and the renewable heat initiative payments) generated 56% of our hire income.  We had 8 regular groups, clubs or organisations that met regularly at the hall for most of the past year – and although we lost one of those groups in February, we have since had 4 

4 of 9 



more groups start, which means we now have 11 groups hiring the Hall regularly (either once or twice a week or once a month). We therefore expect to generate more income in the year ahead as the net number of regular groups hiring the hall has increased by 3, and their combined weekly meeting hours exceeds by some margin the weekly duration of the regular hire that has since been discontinued. 

A fuller analysis of hire income is given below under the narrative for our second objective, but the above headline analysis and narrative suggests that, while we will always operate a policy of striving to continually improve, we met our first objective to provide value for money for our hirers. 

## **MEASURING SUCCESS: OBJECTIVE 2** 

## **To safeguard a sustained return to financial stability** 

The UK's inflation rate in March 2024 (the first month of our financial year), measured by the Consumer  Price  Index  (CPI),  was **3.2%** .  This  was  significantly  lower  than  the  10.1% we experienced in the previous year.  We were therefore able to limit any increase to our standard hourly hire rates (that took effect on 1 March 2024) to a modest amount in line with the lower inflation figure. Our hope and expectation being that keeping our rates affordable, in a period of increasing consumer confidence, would see our hires increase over the year.  When coupled with the modest rise in hourly rates, our annual hire income could increase by 6% or more. 

In the final analysis our hire income alone increased by almost 9.5% (or £1,971.00 more than the  previous year).  When  other income from ground  rent, fund  raising, textiles recycling and renewable heat initiative (RFI) payments from Ofgem were added in, our year-on-year income total improved by £2,075.00 or just over 8%. 

Grant income in the year was just £304.00, compared to £10,229.00 in the previous year – but as grant income is always used to fund improvements to the Hall’s amenities and not for maintenance or other running costs, funds obtained through grants does not directly affect our day-to-day and year-on-year financial viability. 

Analysing our expenditure over the year, we know that our single most expensive overhead is the cost of energy.  We had installed over 20 solar panels and a back-up battery storage system two years ago, and in January 2024 when our commercial contract came up for renewal, we were able to fix a much lower price for the next three years.  We started to feel the benefit of those price cuts during the 2024-25 financial year. Our annual energy costs fell dramatically by 48% from £7,266.00 in 2023-24 to £3,748.00 in 2024-25.  Nevertheless, 

5 of 9 



energy remains our largest annual overhead, closely followed by professional cleaning costs (£2,901.00) and buildings insurance and public liability (£1,143.00).  Taken together, these three annual overheads accounted for 46% of our budgeted expenditure. 

Overall,  our  annual  overheads  (operating  expenses)  reduced  by  £3,819.00  or  18% compared to the previous year.  Although there were ‘swings and roundabouts’ across the other operating budgets, the total saving is almost entirely due to the massive £3,518.00 reduction this year in our energy costs – which completely justifies the investment the trustees made in fitting solar panels and a battery storage system.  The cost of the investment made in financial year 2022-23 was £26,000.00, of which almost £7,000.00 was offset by grant funding.  That meant that the trustees committed £19,000.00 from its reserves to fund the purchase and installation of the system. 

We  have  calculated  that  without  the  solar  panels  and  battery  storage  system  the exponential rise in electricity costs that began at the start of our financial year 2022-23 would have seen our annual costs rise from £3,062.00 in 2021-22 to around £12,000.00.  In the event, our annual electricity costs in both 2022-23 and 2023-24 came in at £7398.00 and £7,266.00 respectively.  Based on these figures (and even allowing for the high contract price in both of those years) the solar panel system saved us around in 2022-23 rise to £12,000.00.  In the event our solar system saved us around £9,336.00 in energy costs over those two years.  If we then add the further savings of £3,518.00 made in the year just ended (2024-25), that shows that in the first three years of operation, the system has saved us a total of at least £12,854.00.  Based on these figures we expect to have recouped the initial expenditure of £19,000.00 by the middle of financial year 2026-27. 

## **Financial Summary: 2023-24** 

At the beginning of the 2024-25 Financial Year (FY) our total opening balances were as follows: 

Lloyds: £27,166.49 (in the previous year it was £27,795.54) PayPal: £7,861.78 (in the previous year it was £5,065.94) **Total Available: £35,028.27** (in the previous year it was £32,861.48) 

At the close of business on Thursday 28 February (the last day of our Financial Year 202425) our balances at Lloyds and PayPal were as follows: 

Lloyds: £32,060.62 PayPal: £6,265.17 

6 of 9 



## **Grand Total: £38,325.79** 

These figures show that we ended the 2024-25 FY with an improved, year-on-year balance of 9.4% or **£3,297.52.** This is an improvement of 2.4 percentage points on the previous year’s outturn measured against the opening balances. 

Since 1 March 2024, our Lloyds’ account has seen the following amounts paid in and paid out: 

|paid out:||||
|---|---|---|---|
|**MONTH**|**PAID IN**|**PAID OUT**|**INCOME v EXPENDITURE**|
|**March**|£298.00|£1,573.64|-£1,275.64|
|**April**|£2,870.00|£1,573.20|+£1,296.80|
|**May**|£1,587.02|£3,586.47|-£1,999.45|
|**June**|£547.50|£2,253.39|-£1,705.89|
|**July**|£2,091.70|£930.68|+£1,161.02|
|**August**|£3,199.32|£1,593.66|+£1,605.66|
|**September**|£1,693.16|£2,081.40|-£388.24|
|**October**|£312.96|£2,726.84|-£2,413.88|
|**November**|£1,799.01|£1,202.05|+£596.96|
|**December**|£1,980.00|£2,180.06|-£2,000.06|
|**January**|£952.00|£1,219.91|-£267.91|
|**February***|£13,305.70|£4,921.44|+£8,384.26|
|**TOTAL**|**£30,636.37**|**£25,842.74**|**+£4,793.63**|



* February income includes £7,500.00 hire income transferred from our PayPal account 

This shows a positive balance of income over expenditure in the year just ended of + £4,793.63 as measured by transactions on our Lloyds account. 

The February transaction shows the transfer of end-of-year PayPal funds for hires that took place during the year, so this table is a true reflection of our annual income over expenditure.  The opening PayPal balance of £6,275.16 (carried forward to the 1 March 2025) represents advance hire income for the next financial year and beyond. 

We had hoped to reach a target surplus of income over expenditure approaching £10,000 by year end, but during the year we encountered several unplanned maintenance issues that required us to commit more funds from our projected margin (surplus) to cover those emergency works.  This is detailed further below. 

Most of these high additional costs had one thing in common:  WATER! 

7 of 9 



- The torrential rainstorms we experienced at various times over the year caused two separate leaks in the roof 

- in December rainwater got into the external lighting units which caused a complete circuit to fail just as a family party was starting . . . . those of you who have had to call out emergency electricians will know that their fees are not cheap!! 

- the hot water immersion heater located in the roof space above the small hall toilets also spectacularly  failed  over  the  Easter  holiday  weekend  last  year  –  which  went undiscovered for at least 4 days.  We had to replace the old cylinder, redecorate the stained ceilings and dry out all electrical wiring 

- we also discovered and dealt with a large wasps’ nest in the eaves above the kitchen window 

- additional costs were incurred by having to replace the locking handles on the main entry doors 

- add to this a very expensive annual service on our Fire Safety Alarm system and we quickly found we had incurred additional unplanned expenditure approaching £9.000.00 over the year – in addition to our planned overhead costs. 

## **MEASURING SUCCESS: OBJECTIVE 3** 

## **To implement an agreed schedule of improvements to the Hall and its amenities as finances allowed.** 

We had initially planned to replace the ageing thermoplastic tiled floor in the Small Hall Lobby, do some internal decorating, order some additional tables and chairs and begin the process of refurbishing the original porch (which is in urgent need of attention).  But as it became clearer that our available surplus would be less than hoped, we had either to scale back our plans or find additional ways to fund the improvements. Emma, one of our trustees volunteered to refresh the paintwork in the Small Hall and in November we made a grant application to the Parish Council to cover the cost of additional furniture, which, we’re delighted to say was subsequently approved – and we are indeed most grateful to both Emma and the Parish Council for this support. The decorating and the delivery of new tables and chairs have now been achieved.  Then at the very end of the financial we had news about a new, local funding opportunity open to us that would allow us to plan for the refurbishment of the original porch in 2025-26. 

8 of 9 



All that said, as we did manage to end the year with a modest surplus, we subsequently committed some of that surplus to fund the replacement of the ageing and inefficient catering oven and microwave in the kitchen. 

And finally, as the new financial year will also be the 80th anniversary of VE Day, we made a forward commitment to restore and replant the two ‘Memorial Garden Planters’ either side of the  original  porch.   A  local  resident,  Barry  Thornley,  an  experienced  gardener  with  an impressive record of achievements in the gardening world volunteered to completely redesign the  planters  and  Bransford  Webbs  Plant  Company  then  agreed  to  sponsor  the  work  by providing some, if not all, of the new plants and shrubs.  Work will commence in May 2025 and will be completed in good time for the gathering outside the hall on Remembrance Sunday, 9 November. 

Needless to say, we are all very excited about this new project which, when completed, will bear testimony to everything that is positive about our local community – where such selfless acts as volunteering your time, influence, expertise and skills really do make an important and lasting difference.  In remembering and honouring our past we also build our hope in the future. 

Jon Gamble, Chair of Trustees 

May 2025 

9 of 9 



Lei
h and 8ranstord M8morl81 Hall and Recreation Ground
dEx
Ondlture forthÈ
riod ended 28th Ftbrua
2025
2023124
2024125
INCOME
10,627.70 Hire of Buildings
10,295.84 Hire of Buildings IPayPall
2.239.00 Ground rént
1,240.00 200. Club
Advertising
Fund Raising
Bank interest- CAF B8nk
10.229.00 Donations & Grants
977.25 Heating rebate
425.50 Clothes recycling
12,491.60
10,403.39
2,354.60
1,240.00
304.40
75.44
36,034.29 TOTAL INCOME
27.880.58
EXPENDITURE
2.618.00 C18an8fs Waoas
323.88 Cleaning Materials
1.015.11 Waste Collection
7.265.69 Electricity
366.38 Water
1.204.50 Insuran
274.32 Healing seNicing
893 52 Telephone
500.00 Rent of L8a88 for Car Park
3.000.W Ground Maintenan
2,9Q1.50
275.88
998.83
3,747.73
681.13
1.143.51
274.32
767.47
500.00
942.(X)
2,190.00 Website
2,563.76
174.38 Fire EouipmBnt MainlenancelTeplacemenl.'
Inspeclionstr8Stlng
1.573.50
332.64 Licenses
662.12 Adminislraiion and sundriés
80.48
551.87
20.820.52 Totsl Oporatlng Exp8nse8
17,001.98
Fundraising expe[￿eS
11.577.99 Extraordinary."
Maintenancelrepairs
Pest Control
6,394.90
60.00
908.99 Improverrbents including equipment
560.00 .200. Club prizes
460.78
665.40
33,867.50 TOTAL EXPENDITURE
24,583.06
2.166.79 Surplusldtficil of Incotne over expenditur6
3.297.52
Signed.
chairni
Signed...
Troasurar
P£ThJ
Dated...
2 o . 24>1>

Lei
h and Brènsford MeMO￿al Hall and Recreation Ground
Year ended 28 Februa
2025
Pa
Pal Summa
Balance
Date
Payments
Received
Refunds Expenses Withdrawals F8es
Balance
7,861.78
8,[￿2.52
8.885.42
9,525.39
10,312.80
10,715.48
12,518.86
12,878.15
13.956.22
14,192.26
15,295.78
17,257.49
Mar-24
Apr-24
May-24
Jun-24
Jul-24
Aug-24
Sep-24
Oct-24
Nov-24
D8c-24
Jan-25
Feb-25
204.00
836.00
888.00
799.00
409.00
2,605.00
365.(M)
1,095.(x)
240.(X)
1,120.(M)
1.992.00
1.023.00
3.26
13.10
13.63
11.59
632
26.62
5.71
16.93
3.96
16.48
30.29
15.32
8.062.52
8.885.42
9.525.39
10,312.80
10,715.48
12,518.86
12.878.15
13.956.22
14.192.26
15.295.78
17.257.49
8.265.17
234.4
775
12000
11,576.LX) 1.009 40
12.000 00
163.21

L•1
19
32tkWJ82
7.&1 78
Ew3•5
7th1.7

Lel h and Bransford Memorial Hall and Re¢reatlon Ground
Year endin
28 Febtua
2025
Summa
of Maintenance E
nditure
Date
1310512024 Colin Breeze
Repla￿ Hot Water Cylinder
13105r2024 Prosser E￿ctrical
Re¢onnect Immersion Light lad
2310512024 Kevin Oliver
Replats Ceilirngs
23105r2024 Shaun Stoker
Rèpair Ceilings and paint
2310512024 Joe Whatmcire Elect
DisconnectiReconnect light
0910412024 Prosser Electrical
Call out to to immersion
1410512024 Travis Perk￿n8
Matewals re repair Trilings
2511012024 A.E.S. Roofing
Repla￿ Slate Clear Gutterin
0211212024 Plutnbing DV Ltd
Emer call out Eleci ￿pair
2210112025 george
Replace Lamp Disable Toilet
07102Q025 Emrn8
Painy for main hall
1310212025 Worcester RenÈwab18s Heaty'ng Antifreeze
1610712024 George
repart toilet lock
13112r2024 ABM Glass
Repart front dotsr k)ck
1,402.20
132.00
660.00
534.00
175.00
108.00
155.14
912.00
850.00
6.97
59.97
1.295.33
8.29
96.00
6.394.90

11
11
ill
llllll
Iiilli
IiimlliNnminnllTlliillMmllllll
11
lllllllllllllHIIIII
Ill
llllll
IIIHll
EHIII
11
11
11
11
11
11
ui
11
11
Ihllllll
llllll
lllllll
UIElll
IlllHlllllllllll
11.1iiiiidll
IIHI
IlllllllLll
11
11
11
lllllll
Ill
Ill
-1 Illlli

¥1
111
lilli
4¥
llllll
lll
lllllll
lllllll
lll
11
Iilliii
Ill
lll
11
llllll
lll
11
11
11
11
11
11
11
11
lll
llllllllllllyllll

CHARITY COMMISSION
FOR ENGLAND AND WALE5
Independent examinerfs
report on the accounts
Strttion A
Independent Examinotrs Report
R8port to the trustst81
mèmbers of
Leigh and Bransford Memorial Hall and Recreatiw Ground
On accounts forthe y•ar
andèd
28 February 2025
Charity no
Ilf any?
5231e3
S•t out on pag88
I report to trustees on my examination of the a￿Ounts of the a￿ve
charity I'the Trust") for tt)e year endèd 2810212021.
Responsiblllti•s anil As Ihe ¢harrty Iwstees of Ihe Trust, you so responsible fortkE preparation
bas￿ of rewt of the a¢¢ovnts In accordarKe wrth the requirements of t￿ Charities Act
20111 the Acri.
I report in respe¢t of my e¥amination of the Trust's accounts carTred out
undèr section 145 of the 2011 Act 8nd in carrying out my examination, I
have followed the applicable Directions given by the Chanty Commissbn
under section 14515llbl of the Act.
I have Completed my examination. I confimi that no Tnaterial matters have
me to my 3ttention lot1￿r than that disdosed below'l in connection wrth
the examination which gives me causé to believe that in, any rnaterial
respect..
Indèpèndent
èx#miner'8 8tstsmant
countrnu ￿COrdS We￿ not kepl in 8ccord8nc8 Wth section 13Q ef
the Act or
the ac¢ounis do not a￿Ord with the accounting records
I have no corKerns and have ceme across no other mattérs In connection
with the examination lo ￿1¢h altanlion be drawn in order to enable a
proper understanding of th& a¢¢ounts to be rea¢FEd.
Please dtrltrle the wotds in Ihe br8ckgts if thsy do nol appty.
sIgn￿..
Date..
1* October 2025
Name..
Louise Ruane
Relevant pr0f*ssional
qualificationlsl or body
lif any):
FCCA
Addres$-
Pear Tree Cottage, Yarrington Road, Alfrick, Worcs, WR6 SEX
IER
Octob•r 2018

Sectign B
Disclosure
Only complete If the examiner needs lo highlight matters of concam (see CC32.
Independent 8xamin*tiun of charty ac¢ount5'. directions and guidance for
examiners).
Give here brief details of
any Items that the
examtner wl$h•s to
di$¢lose.
NDrJE
IER
Octob•r 2018