## Introduction 

BPFMC is a charitable organisation that is run entirely by an amazing group of unpaid volunteers that give up their free time to ensure the continued operation and maintenance of our facilities. We are very fortunate to be supported by annual grants from the Parish Council precept and the Plowright Trust without which we would struggle to continue and want to extend our gratitude. We also want to extend our thanks for Baston Events who helped provide funds to refresh our gravel car park and for the help provided by Thetford Farm saving us days in back breaking labour and to Baston Beats for part funding the new security gates on the front door to the Barn. ~~.~~ 

## 2025 

2025 has been a year of maintenance just like the previous year however this year has also been one of improvements and proved the undeniable value of volunteer provided time and costs saved. 

A major milestone that has supported many other achievements I will cover has been the installation of broadband at the barn. After many months of communication between ourselves and LightSpeed we were able to get fibre run to the building free of charge with an initial FoC contract (this won’t be indefinite) and it has enabled us to be more with the current times and modernise our infrastructure, facilities and service offerings. Whilst this is being used currently to trial connectivity it will, in the coming months be offered to hirers for a small fee (amount to be determined) and we are committed to offering our regular weekly hirers this as a FoC option due to their ongoing support. 

Whilst last year we were victim to several instances of vandalism to which we had to install additional CCTV I’m glad to say that year we have been incident free. The benefit we’ve had this year is with the broadband install, after a lengthy day’s work running a new cat6 cable we have managed to connect the CCTV so that it can be both monitored remotely and the videos retrieved with ease should it be needed. 

A large focus for last year during the warmer months was to make improvements to our heating, which unfortunately due to the various over time additions the barn was not ideally suited to provide the most optimal heating experience. Despite having a boiler repair to arrange and a volunteer having to isolate, drain and replace a radiator valve olive we have made significant improvements which have received glowing feedback. Two volunteers spent around 3 days (using their own annual leave) relocating the poorly placed thermostat in the main hall to the second hall. This meant lots of 

[ ] 



crawling around in the various loft spaces, chasing out the brickwork, filling/sanding and some wiring work saving us thousands in what would have been labour costs and now means all the radiators in the hall ~~now get~~ operate to temperature and both halls are comfortable for all during the colder months. The second stage of this was replacing the two old and manual tamperproof thermostats with smart wireless remote managed thermostats that allow accurate monitoring, regular adjustments and more efficient energy usage. This is still ongoing as the second is yet to be replaced but the main halls were the first for this upgrade. This meant another day’s work from a volunteer to chase in a back box, re- ~~w~~ ire and test the facilities but the upgrade has been a huge time saver for heating call outs and adjustments. Regular monthly monitoring of gas consumption ~~and h~~ as ~~showns~~ hown positive improvements in energy efficiency. ~~with only one of the two having been replaced.~~ 

Whilst doing this work creates mess and damage that can be repaired and then repainted in small areas, we had noticed the decline of the interior finish throughout the barn and decided this would be a good time to tackle these issues. The most pressing was the damp spots appearing in the halls which were due to poor ventilation. We have started installing trickle vents onto the doors (this is ongoing as there’s more to be installed this coming year) taking up more volunteer time to help prevent a re-occurrence of the mould spots. However, this preventative effort also needed considerable decoration work for which we utilised local companies to repair and redecorate both the halls and the entrance/corridor which I’m sure everyone will agree has made such a big difference to the feel and appearance of the facilities. 

To highlight some of the additional work that has been carried out, there has been the installation of a water meter for the cricket supply to help us reclaim sewage abatement, tree maintenance to ensure they’re safe for all that enjoy the facilities and repairing and cleaning the gutters around the main building and storage. 

I think though the biggest change most of you will notice is the addition of the inclusive round ~~a~~ bout in the play area. This was no small task, from securing the grant of £15,771, arranging planning permissions and the hoops that needed to be jumped through in ~~to~~ planning the installation and satisfying the Funding Authorities’ ~~councils~~ post installation reports and information requests. ~~T th~~ is was a massive effort over an 8-month period from our Secretary Martin and one we hope will be thoroughly appreciated and enjoyed by all. 

Whilst this has been a largely positive year unfortunately not everything can be and we have had some challenges this year. The main one that some may have seen is the removal of the 5,7 and 9 aside football pitches. Unfortunately, the agreement made with a local club to fund these was cut short due to an absence of funding, meaning that BPFMC had to incur costs to honour existing bookings. Alongside this there were issues around acceptable code of conduct, treatment of our volunteers, parking concerns and contractors, which ~~that~~ meant this could not be maintained as a sole BPFMC effort and the decision was made to return to a single 11 aside pitch. During this time we also had our annual inspection of the play equipment and were informed that the adult swing was showing signs of rot in the wooden posts, whilst this is not of immediate danger it is something that will need to be addressed in the coming year and quotes for the work are significant enough that it brings into question the validity of repairing over replacing and is something we are currently investigating. 

Finally, we are getting close to this year’s Party in the Park and the huge success we had with 2025’s raising significant funds that have covered a lot of the improvements made. Whilst we know how much everyone enjoyed last year and indeed, we received some glowing feedback for the event from both visitors and vendors. Our costs have significantly increased and without additional investment and support 2026 could be the last year we host the event. We are exploring all avenues and will 

[ ] 



wait to see how successful we are for the upcoming event before any decisions are made however we hope we can find an avenue that allows this to continue for years to come. 

All in 2025 has been a great year for BPFMC and our facilities, whilst there have been some challenges it’s been a year to really demonstrate the value and importance of our volunteers and trustees which without them none of this would have been possible. We even managed to bring some new volunteers and trustees into the mix that with them have brought in a new lease of life and fresh ideas and perspectives. I hope that this continues for 2026 and we can continue to make strides forward in improving and modernising the facilities whilst minimising our costs and overheads. 

[ ] 



**Treasurer’s Report – 2025 Accounts.** Headlines as follows: 

## **ROUTINE INCOME** 

- **Routine Income** – (excluding Donations, Funding, Fireworks & Party in the Park) 

   - Barn Income (less hirer’s deposits) - £6,867 

   - Football and Tennis Income - £4,947 

   - **Total Routine Income** – (less Hirers deposits) = £11,814 (+3.8%) 

- **Donations and External Funding –** including donations from the Plowright Trust, Parish Council and Villagers and project-specific funding from SKDC UK SPF, Baston Events and Baston Beats; 

   - £24,631 (+16%) 

   - Note: 25% of Roundabout funding (£3943) was provided upon completion in 2026 

- **Tennis – includes ad hoc usage, Baston Events hire and Annual Membership** 

   - £1030 (+34%) 

- **Football – reduced usage over 2025 season – Deeping United is now the principal User.** 

   - £3917 

## **ROUTINE OPERATING COSTS** 

- **Grass Cutting and Pitch Marking –** (inc Children’s Play Area) 

   - £7080 (inc £5400 for pitches and line marking) 

- **Barn, Field, Tennis Courts and Children’s Play Area –** includes gas, water, electricity, rates, insurance, licences, cleaning and cleaning materials, statutory electrical, fire extinguisher and boiler testing, play equipment inspection, grass cutting, line marking and general repairs – fence repairs, smoke alarm batteries, CCTV etc… 

   - £21,316 (+6.8%) – due to increased utilities costs, boiler repairs, Wi-Fi, decorating 

## **ROUTINE INCOME versus OPERATING COSTS** 

- **Routine Income** – exc Hirers deposits, donations & funding = £11,814 (+3.8%) 

- **Operating Costs** – exc hirers deposit returns & specific external funded projects = £21,316 (+6.8%) 

- **Deficit** - £9,502 (+10.7%) 

## **TOTAL INCOME versus TOTAL EXPENDITURE** 

- Income = £42,839 (inc SKDC funding, donations and precept funding) 



   - (less £11,832 allocated SKDC 75% funding for Inclusive Roundabout). 

- Available Income = £31,007 

- Expenditure = £28,181 (inc Hirers deposit returns, gravel, door gates) 

- **Net Profit** = £2826 (+49%) [2024 = £1894] 

   - This has allowed BPFMC to conduct more decorating and gutter cleaning (~£1300) 

## **END OF YEAR FIGURES – DEC 2025** 

- **Current Account** £32,541 (- _£11,832 for Roundabout in 2026_ ) = £20,709 (+15%) 

- **Reserve Account** £12,038 (+1.4%) ( _allows for replacement of ¼ of roof or boiler_ ) 

**CONCLUSION** Without the generous donations from the Plowright Trust and the Parish Council (~£9-10k per year) our actual expenditure would significantly outweigh our income and BPFMC would soon be unable to continue to operate the Barn, playing fields, tennis courts and the children’s play area. Consideration would need to be given to raising the hire charges, particularly those associated with the playing fields; or closing the loss-making parts of the facilities. Additionally, end-of-Year Account figures can be mis-leading and must be considered in their entirety, as large funding amounts are often provided in one FY, but have to be accrued into the following year until the project is delivered and invoiced. 



- ] CHARITY COMMISSION
FOR ENGLAND AND WALES
Independent examinerfs report on the
accounts
R¢port to th• tru$tsesl
mgmbBf5 of
Brudenell Playing Fields Management Committee
On accounts for the year
onded
31 Decarn￿r 2025
Chority nts
Ilf anyl
521820
Set out On page5
I report to the trustees on my examination ofthe accounts of the above
charity (￿he Trusfi for the year ended 3111212025.
Re8ponslbllttl88 and basls As the ch8riWs trustees, you are responsible for the prèparation of th&
of rèport
accounts in accordance with the requirements of the Charitie5 Ad 2011
AGt'I
I report in respect of my exarnination of the Trust's a¢¢ounts carrfed out
under 88Ction 145 of the 2011 Act and in carrying out rny examination. I
have followed all the applicable DIrect￿n5 given by the Chaity Cotnmissi
under Section 14515llbl of the Act.
Ind4￿ndant •xamIn•￿8 I have completed my exarnination. I confirm that no material matters have
Statement come to my attention in connection with the gxarninalion which gwes me
caus& to believe that in, any materi81 respect..
the attounting records were not kept in accordance with 88ction 130
of the Charitie5 Aci, or
the accounts did not accord wrth the accounting records". or
the aceounls did not comply wth the applicable requirements
¢on¢eming the fortn and content of account8 $81 out In the Chanti&s
IA¢¢ounts and Report$l Regulation$ 2008 other than any requirem&nt
that the accounty give a'lrue fai￿ view which 1$ not a rnatter
considered as p8rt of an independent exarnination.
I have no concerns and have corne across no other matters in cmnection
with the examination to which attention should be drawn in thi5 report in
order to Ènable a proper understanding of the account8 to be reached.
Please d&l&le the words in th8 br8ck8ls rfthey do notspply.
Slgn¢d:
Date:
irj
Name:
claire Hawkins
Relevant professional
quaiificationlsl or body lif
any)..
ACA
Address..
4, Appian Way. Ba$ton
Peterboiough. PE6 9PR
IER
Oet 2018

Only Gomplele If the exainine( needs to hig11119hl Inat&iial mattéls of coTrc£in
(see CC32, Independent examination of charity account8." dire¢tion5 and
9uidance for exami￿r81.
Gfvo here brlef detslls
ot any item$ that the
examiner wishes to
di8cIoso.
None noted
IER
Oct 2018

AudSt of thE BPFMC accountslor theyear ended 31 De£ember 2025
The followingwork was performed by Claire Hawkin5 on 21 April 2026..
work wrforffled
noted
No exceptions
l. Complete an analyiKal review Df the resulls to ensure that th* amounts
included In the accounts are consistent with your knowledge of the
activities of the Iharity and with prior years. Di5CU55 any exceptions with
the 8PFMC treasurer
ures on the CC16a accounts Cast and cr055 cast
3. CoTnplete a review of the 2025 ac(ount5 to ensure the comparative5 in the
2025 CC16a accounts
ree to the 2024 CC163.
4. En5urethat the openin8 cash balantrs ag￿e to..
2024 accounts
osifion in the BPFMC cash book
Ensure that closing cash balances Icurrent account and buslness reseryel
agree to..
C1051n¥ Position in book5 and records
11. Bank statements
6. Review the current account bank reconciliation. Ensure that the
reconciliation casts and that all amotsnis can be agreed to supportlng
records Icash book and bank statements).
Ensure thatthe total income and expense figurès In the CC16a accounts
aEree$ 10 the income and expense figure5 of the BPFMC books and
records and that the individual item5 of income and expenditure agree to
supporting information provided by the BPFMC treasurer
8. Ensurè by a re￿eW of fomiulae thatthe'annual summarf. file and the
monthlyfiles cast ènd cro55cast
9. Ensure that all figurès in the"annual 5ummarl' file agree to the monthly
No exce
No exceptions
No e%￿ptionS
No eX￿PtIOnS
No exceptims
Mo ex￿PtIOnS
No exceptions
No exceptions
10. Expenditure.. Select a sèmplè of itemsfrom the moTrthlyfiles. Check them
bick to a 5UPWrting invoice and to the bank statement. Ensure validity
and accuracy. Sample selected..
Oct-c Gaifoot- £480.00
11. May- Broker Network lin5urancel- £1,714.46
No exceptions
IV. Apr- 5KDC- £866 Igranr underspend repayment)
V. Mar- D M3son-£450.(M)
11. Income. Select a sample of material items in Ihe BPFMC excel cashbooks
and check them back 10 the bartk ststement and to supportin8
documentation IwhÈre avaIlab￿l-en5Ure accuracy. Safflple selected..
Dec-8in80- £535.
11. May- Baston Parish Coun¢il £1.5￿.
111. Mar- Plowfight Ch8rirableTrust- £7.Ll)o.
IV. Ort-south Kesteven. £11.832.00
V. Oct Baston Parish Council £1,5￿.(￿)
12. Discuss all grants and donationswith the BPFMC trea5urerto gain comfort
over those that ha￿ been disclosed as restrirted income and those thai
have not.
IY. Reviewthe breakdown of restricted Income l£11.8321 and confirm that
Mo exceptions
No elceptions
No eiceptions

14. Obtain 3 breakdown of all BPFMC restricted expenditure IE8661 an
Ènsure that the presentation a5 restricted expendrture is reasonable via
discussions with the BPFMC ireasurer.
15. Ensure the closing amount of restricted funds l£lJ.8321 is appropriate and
reflects ihe activities of BPFMCvla dixussion wilh the BPFMC treasurer
and a rtviewof available 5UPPOrting docutnentation.
No excepiions
No except10fi5
Conclusion..
l am therefore happy to sign the independent examiners report on the con501idated CC16a accounts
of BPFMC for the year ended 31 Decem￿[ 2025
Sionetl..
Doted..
lojfj lkn