Operating costs have been restrained wherever posslble. Payroll at £76,825 is comparable to
2018-19 and reflects some staff changes and the impact of the increases of the National Living
Wage. Although energy costs have fluctuated during the periods of Covid lockdowns and since.
the Centre has benefitted from a fixed rate for gas and electricity set in 2020 and fortuitously.
renewed until 2024 on the same terms. Accordingly, the need to apply any significant increases
to Hire Charges has been avoided
a move welcomed by our users. The Trustees are consCIOUS
though of the potential for a significant rise in utility costs in 2024, and the need to carefully
monitor the situation with the intention of identifying improved energy efficiency andlor
conservation wherever possible.
Total expendlture for the year at £175,987 is also slmllar to that for 2018-19 and has been
supported in part by the Grass Pitch Preparation Grant from the Football Association of £5000
re￿iVed In 2019-20. The Trustees have a150 been successful in securing a further Grant from
the Football A5￿ciatIon for Grass Pitch Maintenan￿, payable annually at reducing rates over a
period of six years. This has enabled the Trustees to agree a contract with Southend Councll
Parks to provide regular maintenance throughout the football season and any repairs or seeding
that would be required during the summer. This is seen as a considerable benefit cofflpared to
the p￿VIouS arrangement for the in-house team to include basic grounds Maintenan￿ within
their other roles. The condition of the playing surfaces reflects the improved tevel of maintenance
possible with appropriate equipment.
Overall expenditure includes the significant costs of managing the ageing built facility. Repairs
totalling £8688 to the roof of the original changing rooms were deferred from the previous year,
while an intended refurbishment of the area of the building, known as the Boardroom, revealed
a structural problem which ha5 required stabilisation at an initial cost of £10,000. The Trustees
are seeking financial support towards the anticipated costs of repair and redecoration to take
Pla￿ during 2023.
Given the many challenges of r￿nt years, and the unscheduled expenditu￿ described, the
Trustees believe that the small operating deficit of £989 for the 2021-22 period is acceptable and
also an indicator of improving finances for subsequent years. The revival of operations ha5 also
enabled our hospitalitylrefreshment facility utilising the Main Hall/Function Room to opernte
effectively, though the Trustees considered it prudent to waive the nominal usage fee for their
operating area. This enabled a small sum (£1551) to be contributed to the cent￿.$ funds. The
stabilised financlal situation enabled the Trustee5 to leave the AGP Renewal Fund (Carpet Fund)
at £80,000. Subsequently, further recovery in the financial health of the Centre has enabled the
Trustees to restore the fund to £IOO,000. Regular maintenance of the AGP has ensured that the
pitch is Withstanding the wear and tear that can occur as a result of the increasing periods of use.
However, it is anticipated that the playing Surfa￿ may require replacernent in three to four years,
the cost of which will be In the region of £200,000. This is a daunting target but one that the
Trustees feel is achievable given the increasing use of all the Centre's facilities apparent from
2022 into 2023 and the availability of further Grant support from the Football Foundation.
The Centre hold the lease of the site from Southend Council wlth a commitment to maintain the
buildings and all amenitie5 a5 a community ￿soUrce, and to provide access to the AGP and Grass
Pitches with their related services, for use by individual groups or teams involved in Grassroots
Football.
The Trustees are satisfied that they fijlfil this commitment but are conscious of the requirements
brought about by the changing demojraphics of local football. A more flexible configuration of
the Grass Pitches may be appropriate to ￿-balance the emerging needs of the many different
groups who seek access to our football facilities with the needs of our regular users.
The Trustees are also keen to erwre that the Centre continues to provide for the needs of local
residents.

|||3 Yearcompa|ris|on||
|---|---|---|---|---|---|
|Overheads||202\-22||2024-21|2019-20|
|Payroll||||||
|LFC(3G)||31431.86||31493.15|44408.29|
|LFC{Grass}||9423.38||7128.96|8204-89|
|ELC(HA)||7356.58||9569.65|7A437.31|
|ELC(Covid)||16483.89||fi947.42||
|TAX/NrC||7777.6L||9313.46|18301.13|
|Pensions||4352.64||4440.8|4381.30|
|||76825.92|||?rssa44ll-ss33z.rrl||
|overheads(utilities!||||||
|Utilities||||||
|6as||751.44||1775.OO|0.00|
|Electricity||9955.32||tr68.48|0.00|
|Water&Sewerage||621.00||2475.OO|0.00|
|||LL327.32||10668.48|L6239.67|
|Overheads{other}||||||
|Rent||8000.00||8000.00|8000.00|
|Rates||160.80||0.00|o|
|lnsurance&Security||6880.37||1.4870.79|8203.60|
|H&S(PPE)||0"00||2752.52|r.08.95|
|Cleaning||4881.56||3870.68|10155.91|
|waste||568s.86||6756.7L||
|Office||||t\57"75|31_t5.2t|
|OfficeSupplies||i"8"03||365.83||
|Worldpay||1,932.40||1412.67|1061.86|
|TV||763.35||577.7L|2L57.25|
|Phone||1029.69||L262.46|1282.89|
|Audit|f-|0.oo<br> <br>lo3sr.od|I|700<br>1rto0_00<br> s14r4rolIs1?rs34l||
|Other||||||
|Legalfees||2580.00||||
|ELCOfficerexps||600.00||90.76||
|Pestcontrol||70.00||310||
|Other||235.L7||105L.49||
|||3485.1|f|<br>L45rr;1f--<br>ofi||
|Total Expenditure||175987.10||150556.47|1s8268.53|






Operating costs have been restrained wherever posslble. Payroll at £76,825 is comparable to
2018-19 and reflects some staff changes and the impact of the increases of the National Living
Wage. Although energy costs have fluctuated during the periods of Covid lockdowns and since.
the Centre has benefitted from a fixed rate for gas and electricity set in 2020 and fortuitously.
renewed until 2024 on the same terms. Accordingly, the need to apply any significant increases
to Hire Charges has been avoided
a move welcomed by our users. The Trustees are consCIOUS
though of the potential for a significant rise in utility costs in 2024, and the need to carefully
monitor the situation with the intention of identifying improved energy efficiency andlor
conservation wherever possible.
Total expendlture for the year at £175,987 is also slmllar to that for 2018-19 and has been
supported in part by the Grass Pitch Preparation Grant from the Football Association of £5000
re￿iVed In 2019-20. The Trustees have a150 been successful in securing a further Grant from
the Football A5￿ciatIon for Grass Pitch Maintenan￿, payable annually at reducing rates over a
period of six years. This has enabled the Trustees to agree a contract with Southend Councll
Parks to provide regular maintenance throughout the football season and any repairs or seeding
that would be required during the summer. This is seen as a considerable benefit cofflpared to
the p￿VIouS arrangement for the in-house team to include basic grounds Maintenan￿ within
their other roles. The condition of the playing surfaces reflects the improved tevel of maintenance
possible with appropriate equipment.
Overall expenditure includes the significant costs of managing the ageing built facility. Repairs
totalling £8688 to the roof of the original changing rooms were deferred from the previous year,
while an intended refurbishment of the area of the building, known as the Boardroom, revealed
a structural problem which ha5 required stabilisation at an initial cost of £10,000. The Trustees
are seeking financial support towards the anticipated costs of repair and redecoration to take
Pla￿ during 2023.
Given the many challenges of r￿nt years, and the unscheduled expenditu￿ described, the
Trustees believe that the small operating deficit of £989 for the 2021-22 period is acceptable and
also an indicator of improving finances for subsequent years. The revival of operations ha5 also
enabled our hospitalitylrefreshment facility utilising the Main Hall/Function Room to opernte
effectively, though the Trustees considered it prudent to waive the nominal usage fee for their
operating area. This enabled a small sum (£1551) to be contributed to the cent￿.$ funds. The
stabilised financlal situation enabled the Trustee5 to leave the AGP Renewal Fund (Carpet Fund)
at £80,000. Subsequently, further recovery in the financial health of the Centre has enabled the
Trustees to restore the fund to £IOO,000. Regular maintenance of the AGP has ensured that the
pitch is Withstanding the wear and tear that can occur as a result of the increasing periods of use.
However, it is anticipated that the playing Surfa￿ may require replacernent in three to four years,
the cost of which will be In the region of £200,000. This is a daunting target but one that the
Trustees feel is achievable given the increasing use of all the Centre's facilities apparent from
2022 into 2023 and the availability of further Grant support from the Football Foundation.
The Centre hold the lease of the site from Southend Council wlth a commitment to maintain the
buildings and all amenitie5 a5 a community ￿soUrce, and to provide access to the AGP and Grass
Pitches with their related services, for use by individual groups or teams involved in Grassroots
Football.
The Trustees are satisfied that they fijlfil this commitment but are conscious of the requirements
brought about by the changing demojraphics of local football. A more flexible configuration of
the Grass Pitches may be appropriate to ￿-balance the emerging needs of the many different
groups who seek access to our football facilities with the needs of our regular users.
The Trustees are also keen to erwre that the Centre continues to provide for the needs of local
residents.