Chairman’s Report Annual General Meeting 12[th] August 2026
Shamley Green Village Hall Registered Charity No 1212460 Reporting Period: 1[st] March 2025 to 28[th] February 2026
Thank you all for taking the time to join us for this inaugural Annual General Meeting of Shamley Green Village Hall known as Arbuthnot Hall Registered Charity no 1212460. The continuing support of all our stake holders is vitally important to ensure the ongoing success of not only the Hall redevelopment project but also to ensure the sustainable operation of the Charity maintaining and operating the Arbuthnot Hall for the benefit of our entire community.
Progress: Tonight, we will report to you on the progress we have made since the formation of the CIO, the transfer of assets from the former Charitable Trust whilst presenting our annual Report and Accounts for the period ended 28[th] February 2026.
Purpose: The object of the charity remains the provision and maintenance of a village hall for the use of the inhabitants of the Civil Parish of Wonersh and the neighbourhood thereof without distinction of political, religious or other opinions, including use for: meetings, lectures classes other forms of recreation and leisure-time occupation, with the object of improving the conditions of life for the inhabitants.
Main Achievements and Performance: These are very exciting times for the Charity, and today we will take this opportunity to update you of our main achievements against our objectives. Of course, the overarching focus of the Trustees over the past year has been working towards the successful delivery of the Hall Redevelopment Project. So tonight, the Management Committee will present to you the key highlights.
Hall Redevelopment: Alastair Houghton and Tim Harlow will report on the progress we have made on the redevelopment project. To get our main Contractor on site on 2 July 2026 to commence work on the current estimated 52 week build programme has been a massive undertaking. I would like to thank all the Trustees on our property team supported by our professional team led by Richard Wilkinson and Paul Rawsthorne of Quarry Architects (formerly Lytle Associates), together with all our consultants.
Obviously, a key focus is to manage the risk of bringing the project in on time and in budget. For this we have employed a team of professionals, with a carefully chosen Main Contractor together with Architects, Quantity Surveyors, and Consultants interfacing with our Management Team including Chartered Surveyors and Accountants. We commenced the building works with a significant contingency of £100,000 with a fixed price building contract however until the construction of the redevelopment is out of the ground there is a risk that unknown issues can still arise which incur additional cost. Therefore, as part of an ongoing process we are managing any adverse impact by scrutinising costs through undertaking elements of value engineering of the project.
We continue to raise funds for fixtures, fittings and equipment and we will look to top up our contingency if required.
Fundraising: The Fundraising Team led by Jim Drummond has worked extremely hard to successfully raise an amazing £1.987m. Tonight Jim will report on how and what has been achieved. I would like to record the Trustees thanks to all who have supported and donated to our fundraising. What I believe has been vital to the success of our fundraising is we have obtained support from right across our entire community be they; Surrey County Council through
SHAMLEY GREEN VILLAGE HALL (1212460) TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
4
their ‘Your Fund’, Waverley Borough Council, through allocation of CIL, to the Wonersh Parish Council, Wonersh Foundation, to Trusts, to our local church, clubs, societies and business, to all the individual donors through our Friends of Arbuthnot Hall scheme and to those who have ‘Bought a Brick’.
I would also like to record our thanks to the 200 Club, which is a lottery separately run from the hall charity, managed by Neil Harding, Alan Pavia and David Blake who together with all its members have provided and continue to provide a valuable contribution to the hall and our fundraising.
Hall Events/ Communications: Lucy Camsey and Lyn Barber have very effectively led our events team and have given me their report as they cannot be here tonight. Our continued programme of highly successful events is a key objective. These events are fundamental not only as a way for the hall to generate income but also to allow people from across our community to benefit by using the hall throughout the year.
Thank you to all who have helped organise and manage these events and all who have supported by attending these events. During the hiatus created by the closure of the hall for our own events we have tried to use as many of the other local facilities as possible.
Governance Structure and Management:
Transfer of existing charity from a Charitable Trust to a Charitable Incorporated Organisation (‘CIO’)
A philosophy we have always adopted in our approach towards Governance is to use best practice. Mike Band will report on our successful creation and transfer of all the assets and undertakings of the former charitable trust to the charitable incorporated organisation. My thanks go to Mike and our Governance Team for all the hard work in completing this task.
We continue to work on policies and procedures to ensure they meet current legislation, are relevant and proportionate. In the interests of transparency copies of all our existing policies and procedures are available on our website: www.arbuthnothall.org.
Management Committee
As a Management Committee we have operated since the last GM with the following:
Elected Members - Trustees - Voting
Paulina Bayliss - Secretary
Fiona Cameron- Treasurer
Lucy Camsey
Mike Band
Jon Watson - Chair
Representative Members - Trustees - Voting
Jim Drummond - Cricket Club
Lindsey Slater - SGVA
Chris Howard - Wonersh Parish Council
SHAMLEY GREEN VILLAGE HALL (1212460)
TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
5
Tim Harlow - Fete Committee
Co Opted Members - Trustees - Voting
Alastair Hilton
Associate Members - Non Trustees - Non Voting
Lyn Barber
In Attendance
Ali Bull - Hall Manager
Louisa Coughtrey – Bookkeeper
I would also like to record the fact that at the time of the formation of the CIO, Colin Ryle attended MC as an observer with the intention that he would become a Representative Member however as many of you know Colin sadly passed away last summer. I would therefore like to record my thanks to him for his support during this time.
To be efficient we continue to operate in working groups in respect of Property, Fundraising, Events and Comms, Finance, and Treasury, Governance and Hall Operations. These groups report back to the Management Committee where all decisions are made.
In addition, we remain ever mindful that we need to continue to operate the hall in an efficient, professional manner on a day-to-day basis, and to offer a welcoming environment that is also safe.
Finances are Satisfactory: I can confirm the financial position of the charity for the year in question is satisfactory. A full report on this will be presented by Fiona Cameron our Treasurer.
We continued to maintain or policy of retaining £30,000 as a strategic non distributable reserve. This reserve is calculated as being the cost to conduct an orderly wind down of the Charity over a period of 12 months should the need ever occur.
It should be reported that as part of the transfer of the assets of the Charitable Trust to the CIO, the Official Custodian was reluctant to hold as nominee the Legal Title of the Hall Land and Buildings. As a result, the Trustees agreed that these assets should now be held by the Charity.
Further it should be noted that post balance sheet date as a condition of Surrey Council Your Fund Surrey making a grant of £900,000 to the charity the Trustees agreed to grant in their favour a Legal Charge over the freehold land and buildings. This will be in place for 15 years. In order to do this the Trustees took legal advice from our Solicitors, Moore Barlow and specialist financial advice from accountants, Saffrey’s.
During the redevelopment phase the Finance Team are undertaking rigorous monitoring of all fundraising, redevelopment expenditure against budget and cashflow, whilst also ensuring the financing of the day to day operations are robust.
I would like to thank the great work that both Fiona and Louisa have done in producing this set of accounts. As you will see these accounts are far more exacting and have therefore required both of them to put in a huge amount of work to produce them.
New Beginnings/ Reopening of the Hall: Chris Howard and Louisa Coughtry will present a thought-provoking piece on New Beginnings/ Reopening the Hall.
SHAMLEY GREEN VILLAGE HALL (1212460)
TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
6
As we now enter the year one of the redevelopment period at the hall the Trustees will be taking our time to:
-
Review our Management Structure and Operations so that we can meet the needs of the renewed building and its operation.
-
Invest in training for Trustees and Volunteers.
-
Assess and develop the great ideas for new activities that we have received and continue to receive of what the hall can offer to the community.
-
Ensure our existing users return and get the full benefit of the new facilities.
-
Build a launch programme of communications and activities in order to achieve first year growth in line with our 3-year Business Plan post opening.
-
Build effective management reporting to monitor performance of the Charity in line with Business plan .
Thank You: As ever we have benefited from having Ali Bull as our Hall Manager, with of course Jan Hawick keeping the hall clean. Thank you for helping to ensure the hall is a safe and welcoming place for all users.
I would also like to thank a number of people who have helped us over the past year, be it; sharing their thoughts, ideas and expertise or help run an event at the hall. Such help is invaluable and makes a real difference to us as a management team.
In writing this report two key factors stand out as to why we have been able to have successfully achieved so much to get the hall redevelopment project to this stage.
Firstly, Support - We have been fortunate to get so much support and belief in this project from our whole community in so many ways; and,
Secondly, we have been able to clearly demonstrate the future benefit of the redevelopment of the hall to our whole community.
These key factors take us back to the principles of the charity and I am sure that Elinor Arbuthnot would approve.
Finally, I would like to thank the entire Management Committee for their help and support. At times the journey we are on at the Arbuthnot Hall can be challenging however I believe as you will see tonight this a very exciting time for the Arbuthnot Hall as we retain the 'Arts and Crafts' heritage of the Hall and secure it as a community asset for future generations.
Jonathan Watson
Chair
12 August 2026
SHAMLEY GREEN VILLAGE HALL (1212460)
TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
7
SHAMLEY GREEN VILLAGE HALL (1212460) TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
8
SHAMLEY GREEN VILLAGE HALL (1212460) TRUSTEES ANNUAL REPORT FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
9
SHAMLEY GREEN VILLAGE HALL (1212460) STATEMENT OF FINANCIAL ACTIVITIES FOR THE PERIOD 1 MARCH 2025 to 28 FEBRUARY 2026
| Note Income and endowments from: Donations and legacies 4 Charitable activities 4 Other trading activities 4 Investments 4 Total Expenditure on: Raising funds 5 Charitable activities 5 Total Net income / Net movement in funds Reconciliation of funds: Total funds brought forward Total funds carried forward |
Unrestricted Funds Restricted Funds Total Funds Prior Period 2024/25 Total Funds £ £ £ £ 6,656 153,102 159,758 94,278 10,940 0 10,940 12,611 23,159 2,463 25,622 25,850 829 3,626 4,455 2,064 |
|---|---|
| 41,584 159,191 200,775 134,803 |
|
| 6,923 201 7,124 7,850 23,985 0 23,985 44,805 |
|
| 30,908 201 31,109 52,655 |
|
| 10,676 158,990 169,666 82,148 70,268 90,266 160,534 78,386 80,944 249,256 330,200 160,534 |
Signed on behalf of the charity’s trustees
----- Start of picture text -----
Signature(s)
Full name(s) Jonathan Watson Fiona Jane Catherine Cameron
Position (eg Secretary, Chair,
etc) [Chair ] Treasurer
Date
12 August 2026
----- End of picture text -----
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
10
SHAMLEY GREEN VILLAGE HALL (1212460) BALANCE SHEET FOR THE PERIOD 1 MARCH 2025 to 28 FEBRUARY 2026
| Note Fixed Assets Tangible assets 7 Current Assets Debtors 8 Cash at bank and in hand Total Current Assets Liabilities Creditors (Amounts falling due within one year) 9 Net current assets Total net assets The funds of the charity: Restricted funds 10 Unrestricted funds 10 Total funds |
Unrestricted Funds Restricted Funds £ £ 0 90,219 3,524 7,194 83,135 154,873 |
Total Funds Prior Period 2024/25 Total Funds £ £ 90,219 0 10,718 18,068 238,008 150,614 |
|---|---|---|
| 86,659 162,067 |
248,726 168,682 |
|
| 5,715 3,030 |
8,745 8,148 |
|
| 80,944 159,037 |
239,981 160,534 |
|
| 80,944 249,256 |
330,200 160,534 |
|
| 249,256 90,266 80,944 70,268 330,200 160,534 |
Signed on behalf of the charity’s trustees
----- Start of picture text -----
Signature(s)
Full name(s) Jonathan Watson Fiona Jane Catherine Cameron
Position (eg Secretary, Chair,
etc) [Chair ] Treasurer
Date
12 August 2026
----- End of picture text -----
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
11
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 to 28 FEBRUARY 2026
Note 1. Basis of preparation
recognised at cost or transaction value unless otherwise stated in the relevant note(s) to these accounts. The financial statements have been prepared in accordance with the statement of Recommended Practice: Accounting and Reporting by Charities preparing their accounts in accordance with the Financial Reporting Standard applicable in the UK and Republic of Ireland (SORP) and the Financial Reporting Standard applicable in the UK and Republic of Ireland (FRS 102) and the Charities Act 2011.
Shamley Green Village Hall (the “CIO”) is a charitable incorporated organisation, with charity registration number 1212460. The CIO constitutes a public benefit entity as defined by FRS 102.
The CIO was registered with the Charity Commission on 10[th] March 2025 but remained dormant until 31[st] July 2025 when Shamley Green Village Hall (charity registration number 305149) transferred its activities, assets and liabilities to the CIO. The accounts have therefore been prepared on a merger accounting basis for the accounting period 1[st] March 2025 to 28[th] February 2026.
Note 2. Going Concern
reasonable expectation that the CIO has su�icient resources to continue in operational existence for the foreseeable future. These accounts have therefore been prepared on a going concern basis.
Note 3. Accounting Policies
The following accounting policies have been applied consistently in dealing with terms which are considered material in relation to the charity’s financial statement.
3.1 Recognition of income
All income including interest income is recognised once the charity has entitlement to the income, if it is probable that the income will be received, and the amount of income receivable can be measured reliably.
3.2 Donations and Grants
Income from donations or grants is recognised when there is evidence of entitlement to the gift, receipt is probable and its amount can be measured reliably. In the case of a cash donation entitlement usually arises immediately on its receipt. However, some gifts may include terms or conditions which must be met before entitlement.
Any recoverable gift aid is recognised on the same basis as the donation to which it relates to .
3.3 O�setting
There has been no o�setting of assets and liabilities, or income and expenses, unless required or permitted by the FRS 102 SORP or FRS 102.
SHAMLEY GREEN VILLAGE HALL (1212460)
NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
12
3.4 Income from interest, royalties and dividends
This is included in the accounts when receipt is probable and the amount receivable can be measured reliably.
3.5 Recognition of Expenditure and liabilities
Liabilities are recognised on an accrual basis as a liability is incurred ie as soon as there is a legal or constructive obligation committing the charity to that expenditure, it is probable that settlement will be required, and the amount of the obligation can be measured with reasonable certainty.
3.6 Support costs
Support costs are those central functions that assist the work of the charity but do not result directly from undertaking charitable activities. Material support costs have been allocated to activity categories on a basis consistent with the use of resources .
3.7 Volunteer help
The value of any voluntary help received is not included in the accounts but is described in the trustee’s annual report.
3.8 Taxes
The CIO as a charity is exempt from paying corporation tax. VAT is irrecoverable and where applicable is added to the expenditure amounts.
3.9 Tangible Fixed Assets
The Shamley Green village hall was donated to the old charity in 1904 and is now fully depreciated so it is not included in the Balance Sheet.
The village hall will be redeveloped from 1 July 2026. There has been a design and investigation stage during this financial period and the design fees and costs for this stage have been capitalised as WIP costs under tangible fixed assets. These will not be depreciated until the hall has been completed.
3.10 Debtors
Debtors including trade debtors, are recognised at the settlement amount due after any discount o�ered .
3.11 Cash and cash equivalents
Cash and cash equivalents include cash in hand and deposits held at call with banks.
3.12 Creditors
Creditors including trade creditors, are measured at settlement amounts less any trade discounts.
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
13
Note 4a. Analysis of Income (Current Period 1 March 2025 to 28 February 2026)
| Donations and Legacies Donations Gift Aid Grants Charitable Activities Hall Hire Hall Parking Hire Other Trading Activities Fundraising Events Lotteries Investments Bank Interest Other investment income Total Income |
Unrestricted Funds Restricted Funds Total Funds 6,342 116,092 122,434 314 17,010 17,324 0 20,000 20,000 |
|---|---|
| 6,656 153,102 159,758 |
|
| 9,494 0 9,494 1,446 0 1,446 |
|
| 10,940 0 10,940 |
|
| 23,159 2,463 25,622 0 0 0 |
|
| 23,159 2,463 25,622 |
|
| 829 3,006 3,835 0 620 620 |
|
| 829 3,626 4,455 |
|
| 41,584 159,191 200,775 |
Note 4b. Analysis of Income (Prior Period 1 March 2024 to 28 February 2025)
| Donations and Legacies Donations Gift Aid Grants Charitable Activities Hall Hire Hall Parking Hire Other Trading Activities Fundraising Events Lotteries |
Unrestricted Funds Restricted Funds Total Funds 7,365 71,929 79,294 0 14,984 14,984 0 0 0 |
|---|---|
| 7,365 86,913 94,278 |
|
| 11,180 0 11,180 1,431 0 1,431 |
|
| 12,611 0 12,611 |
|
| 21,348 0 21,348 0 4,502 4,502 |
|
| 21,348 4,502 25,850 |
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
14
| Investments Bank Interest Other investment income Total Income |
1,111 736 1,847 217 0 217 |
|---|---|
| 1,328 736 2,064 |
|
| 42,652 92,151 134,803 |
Note 5a. Analysis of Expenditure (Current Period 1 March 2025 to 28 February 2026)
| Raising funds Hall Events Fundraising Costs Charitable Activities - Hall Hire Hall management contractors Licenses and rates Utilities Cleaning and waste Routine maintenance Insurance Communications and marketing Broadband and telephone Hall redevelopment Legal fees Sundries Total Expenditure |
Unrestricted Funds Restricted Funds Total Funds 6,923 69 6,992 0 132 132 |
|---|---|
| 6,923 201 7,124 |
|
| 6,308 0 6,308 948 0 948 3,845 0 3,845 3,064 0 3,064 594 0 594 1,230 0 1,230 1,096 0 1,096 707 0 707 0 0 0 6,114 0 6,114 79 0 79 |
|
| 23,985 0 23,985 |
|
| 30,908 201 31,109 |
Note 5b. Analysis of Expenditure (Prior Period 1 March 2024 to 28 February 2025)
| Raising funds Hall Events Fundraising Costs Charitable Activities - Hall Hire Hall management Licenses and rates Utilities Cleaning and waste |
Unrestricted Funds Restricted Funds Total Funds 7,707 143 7,850 0 0 0 |
|---|---|
| 7,707 143 7,850 |
|
| 5,594 0 5,594 889 0 889 4,466 0 4,466 4,633 0 4,633 |
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
15
| Routine maintenance Insurance Communications and marketing Broadband and telephone Hall redevelopment Legal fees Sundries Total Expenditure |
1,866 0 1,866 1,014 0 1,014 272 0 272 682 0 682 4,914 12,335 17,249 7,937 0 7,937 203 0 203 |
|---|---|
| 32,470 12,335 44,805 |
|
| 40,177 12,478 52,655 |
Note 5c. Support Costs
The charity has incurred expenditure on support costs which total £6,114 (2024/25: £7,937). These relate to legal fees incurred by the charity in setting up and transferring to the CIO as shown in note 5a (2024/25: 5b).
Note 6. Related Party Transactions and Trustees Remuneration
The Trustees all give freely their time and expertise without any form of renumeration or other benefit in cash or kind (2024/25: £nil)
Three trustees were paid £1,331.13 for expenses incurred by them on behalf of the hall (2024/25 four trustees £1,938.77). These expenses were costs of the fundraising events and ancillary administrative costs paid for on behalf of the charity.
The aggregate amount of donations received from related parties with conditions attached to them is nil (2024/25: £nil).
There were no other related party transactions.
Note 7. Tangible Fixed Assets
| Cost At 1 March 2025 Additions At 28 February 2026 Net book value At 1 March 2025 At 28 February 2026 |
Land and Buildings (under construction) 0 90,219 |
|---|---|
| 90,219 | |
| 0 90,219 |
additions shown above represents allowable capital expenditure. No depreciation will be made until the redevelopment project is completed.
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
16
Note 8. Debtors
| Note 8. Debtors |
|
|---|---|
| Amounts falling due within 1 year: Trade debtors Prepayments and accrued income Total Note 9a. Creditors Amounts falling due within 1 year: Trade creditors Accruals and deferred income Other Total Note 9b. Deferred Income Brought forward Released in year Deferred in year Carried forward |
2025/26 2024/25 2,308 853 8,410 17,215 10,718 18,068 |
| 2025/26 2024/25 6,294 4,289 2,101 2,709 350 1,150 8,745 8,148 |
|
| 2025/26 2024/25 2,709 1,070 (2,709) (1,070) 2,101 2,709 2,101 2,709 |
Deferred income for both periods is attributable to payments received for hall hire and hall events for dates falling in the next period.
Note 10. Fund Analysis
The charity has a restricted fund “Redevelopment Fund (Restricted)” for monies donated for the development of the hall. It also has a restricted fund “Village Hall (Under Construction)” representing the hall building which the charity is in the process of developing.
Unrestricted funds comprise those funds which the trustees are free to use for any purpose in furtherance of the charitable objectives. Within unrestricted funds, there are non-distributable reserves of £30,000 as approved by the trustees in November 2024. The Trustees have also resolved to setup a designated fund “Redevelopment Fund (Designated)” for free monies they have opted to put towards the development project.
| Brought | Carried | ||||
|---|---|---|---|---|---|
| 2025/26 | forward | Income | Expenditure | Transfers | Forward |
| General Fund | 20,419 | 37,775 | (30,908) | (16,078) | 11,208 |
| Non-distributable | |||||
| reserves | 30,000 | 0 | 0 | 0 | 30,000 |
| Redevelopment Fund | |||||
| (Designated) | 19,849 | 3,809 | 0 | 16,078 | 39,736 |
| Redevelopment Fund | |||||
| (Restricted) | 90,266 | 159,191 | (201) | (90,219) | 159,037 |
| Village Hall | |||||
| (Under Construction) | 0 | 0 | 0 | 90,219 | 90,219 |
SHAMLEY GREEN VILLAGE HALL (1212460)
NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
17
(31,109)
Total Funds
160,534
200,775
0
330,200
There have been no transfers from restricted to unrestricted funds or vice versa in the current period. Transfers in the current period made between unrestricted funds included £16,078 of monies the Trustees elected to transfer from the general fund to the designated development fund. Transfers in the current period made between restricted funds included £90,219 of capital expenditure on the development project.
| 2024/25 General Fund Non-distributable reserves Redevelopment Fund (Designated) Redevelopment Fund (Restricted) Total Funds |
Brought forward Income Expenditure Transfers Carried Forward 49,562 39,120 (35,263) (33,000) 20,419 0 0 0 30,000 30,000 18,231 3,532 (4,914) 3,000 19,849 10,593 92,151 (12,478) 0 90,266 |
|---|---|
| 78,386 134,803 (52,655 0 160,534 |
There were no transfers from restricted to unrestricted funds or vice versa in the prior period. Transfers in the prior period made between unrestricted funds included £30,000 representing the agreement by Trustees of their non-distributable reserves policy, and £3,000 of monies the Trustees elected to transfer from the general fund to the designated development fund.
Note 11. Charities merger
As outlined in Note 1, these accounts have been prepared on a merger accounting basis. The charity Shamley Green Village Hall (305149), a charitable trust, transferred all of its activities, assets and liabilities to the charity Shamley Green Village Hall (1212460) on 31 July 2025.
Analysis of principal SoFA components for the current reporting period 2025/26
| Total Income Total expenditure Net income / (expenditure) Other gains / (losses) Net movement in funds |
Charitable Trust CIO Combined Total 104,410 96,365 200,775 (12,642) (18,467) (31,109) |
|---|---|
| 91,768 77,898 169,666 0 0 0 |
|
| 91,768 77,898 169,666 |
Analysis of principal SoFA components for the previous reporting period 2024/25
| Total Income Total expenditure Net income / (expenditure) Other gains / (losses) Net movement in funds |
Charitable Trust CIO Combined Total 134,803 0 134,803 (52,655) 0 (52,655) |
|---|---|
| 82,148 0 82,148 0 0 0 |
|
| 82,148 0 82,148 |
SHAMLEY GREEN VILLAGE HALL (1212460) NOTES TO THE ACCOUNTS FOR THE PERIOD 1 MARCH 2025 TO 28 FEBRUARY 2026
18
Analysis of net assets at the date of merger 31 July 2025
| Net assets Represented by: Unrestricted funds Restricted income funds Total funds |
252,302 0 252,302 75,133 0 75,133 177,169 0 177,169 252,302 0 252,302 |
|---|---|
Note 12. Post Balance Sheet Events
However, we have now successfully raised commitments of nearly £2m and trustees are in the process of entering into a build contract with the aim to sign by the 30 June.
Note 13. Independent examiner
Richard Holmes is the independent examiner and he gave his time for free.