|**WESTBURY SHED 2022/23**|**WESTBURY SHED 2022/23**|**WESTBURY SHED 2022/23**|**WESTBURY SHED 2022/23**|**WESTBURY SHED 2022/23**|**WESTBURY SHED 2022/23**|||||
|---|---|---|---|---|---|---|---|---|---|
|||||||||||
|DATE|INCOME Co-op|INCOME Lloyds|COMMENT|||EXPENDITURE|COMMENT|BANK TOTAL Co-op|BANK TOTAL Lloyds|
|01/03/2022||||||||£5,082.75|£8,199.80|
|||||||||£13,282.55||
|07/03/2022<br>08/04/2022<br>11/04/2022<br>11/04/2022<br>11/04/2022<br>13/06/2022<br>01/08/2022<br>04/11/2022||||||£13.99<br>£45.88<br>£1,136.41<br>£660.00<br>£1,080.00<br>£192.54<br>£135.00<br>£5,789.00<br>£562.00<br>Spent<br>£879.64|Screws Material £13.99<br>Splitter £32.23, Saw Blas£11.49, Screws £2.16<br>Bill Alfred Rent July 21 to March 22<br>Alfred St Rent End<br>WCP Rent till Oct 22<br>Insurance<br>Paint for unit and main lock<br>Purchase Cabin<br>Cabin Planning and Drawings<br>103.76 bandsaws blades, Materials £332.23, Benchs<br>389.49, Lock £54.16|£13.99<br>£45.88<br>£1,136.41<br>£660.00<br>£1,080.00<br>£192.54<br>£135.00<br>£879.64||
|||£2.00||||||||
|||||||||||
||||||||||£5,789.00<br>£562.00|
|||£5,000.00||||||||
|||||||||||
||£660.00|||||||||
|||||||||£4,143.46|£6,351.00|
|||||||||**Bank Position**||
|28/02/2023|£660.00|£5,002.00||||£10,494.46|**Total Spent**|£1,599.29|£6,850.80|
|||**£5,662.00**||||**£10,494.46**||**£8,450.09**||
|||**Income**||||**Expenditure**||||
||Income for 2022/2023 was to<br>lower as no Project work was<br>£660and we now have £5000<br>charged due to still low atten|tal £5662, this was made up tottally from local grants. Income was<br>planned. Grant for special tooling to be spent at the allotments<br>towards our planned move out of the WCP. no membership was<br>dance.|||Start of the financial year as at 01/03/2022 was £13282 with Expenditure for 2022/2023 was total £10494.46 this included £2876.41 for all rents, this<br>was due to moving units and covid still having an impact on moving into WCP, with retaining Alfred st as a plan to return if WCP was not a viable<br>option. Tools and equipment purchases was £1074.51 as covid reduced activity . Project work of purchasing our own portacabing to move out of<br>WCP was completed in Dec 22 at a cost £6351, this should allow us to be rent free, with only electric to pay.  It  was costed and completed during the<br>financial year with a grantstowards the project received at £5000. The Position of funds in the bank as 28/2/2022 was  £8450.09 making a reduction<br>in the bank  of £4832.46 although running costs should now refect a yearly saving of around £4800 (proposed WCP rent rise) The 2022-23 running<br>cost was £4143|||||
|**Grants**|Mercers<br>Town Council Allotments|£5,000.00<br>£660.00|£5,660.00|||**Rent**|WCP Rent inc Electric<br>Allotment Rent<br>Alfred St Rent<br>Electric|£1,080.00<br>£0.00<br>£1,796.41<br>£0.00|£2,876.41|
|Donated Tools|Selling Tools & Planters||£0.00|||||||
|||||||**Equipment & Tools**|Benches<br>Tools<br>Materials<br>Lock<br>Screws and tools<br>Materials Paint|£389.49<br>£103.76<br>£332.23<br>£54.16<br>£59.87<br>£135.00|£1,074.51|
|||**Total**|**£5,660.00**|||||||
|||||||**Project costs**|Cabin<br>Planninginc Drns|£5,789.00<br>£562.00|£6,351.00|
|||||||**Insurance**<br>**Miscellaneous**|Public liability|£192.54|£192.54|
|||||||||**Total**|**£10,494.46**|
|||||||||||