||**Trustees' Annual Report**|**Trustees' Annual Report**|**Trustees' Annual Report**|**Trustees' Annual Report**|**Trustees' Annual Report**|**Trustees' Annual Report**|**for theperiod**|**for theperiod**|**for theperiod**|**for theperiod**||
|---|---|---|---|---|---|---|---|---|---|---|---|
||**From**|Period start date||||**T**<br>**o**|Period end date|||||
|||Day01|Month<br>01||Year<br>2025||Day31|Month12||Year<br>2025||
|||||||||||||
|Section A||Reference and administration details||||||||||
|||||||||||||
||**Charity name**|||EcoSwell UK||||||||
|||||||||||||
|**Other names charity is known by**||||EcoSwell||||||||
|||||||||||||
|**Registered charity number(if any)**||||1164335||||||||
|||||||||||||
|**Charity's principal address**||||17 Balmoral Terrace||||||||
|||||Newcastle upon Tyne||||||||
|||||||||||||
|||||**Postcode**|||||NE6 5YA|||
|||||||||||||



## **Names of the charity trustees who manage the charity** 

||1<br>2<br>3|**Trustee name**|**Trustee name**|**Office (if any)**|**Office (if any)**|**Dates acted if not for whole**<br>**year**|**Dates acted if not for whole**<br>**year**|**Name of person (or body) entitled**<br>**to appoint trustee (if any)**|
|---|---|---|---|---|---|---|---|---|
|||Alex Stewart<br>Mardan||||10/11/2015 – 31/12/2025|||
|||Sivasakthy<br>Selvakumaran||||01/07/2016 – 31/12/2025|||
|||Edward<br>Beardsmore||||10/11/2015 – 31/12/2025|||
||||||||||



## **Names of the trustees for the charity, if any, (for example, any custodian trustees)** 

**Name Dates acted if not for whole year** 

## **Names and addresses of advisers (Optional information)** 

**Type of adviser Name Address** 

## **Name of chief executive or names of senior staff members (Optional information)** 

## **Section B              Structure, governance and management** 

1 March **2012** 

**TAR** 



## **Description of the charity’s trusts** 

Constitution Type of governing document (eg. trust deed, constitution) Charitable Incorporated Organisation (CIO) How the charity is constituted (eg. trust, association, company) Appointed by the existing charity trustees and approved by all, including Trustee selection methods the consent of members of EcoSwell Peru. (eg. appointed by, elected by) **Additional governance issues (Optional information)** 

You **may choose** to include additional information, where relevant, about: 

- policies and procedures 

- adopted for the induction and training of trustees; 

● the charity’s organisational structure and any wider network with which the charity works; 

- relationship with any related 

- parties; 

- trustees’ consideration of 

- major risks and the system and procedures to manage them. 

## Section D                      Achievements and performance 

2 March **2012** 

**TAR** 



## Section D                      Achievements and performance 

**Summary of the main achievements of the charity during the year** 

EcoSwell’s core belief is that both people and nature can thrive in unison. Since 2013, we have worked to empower vulnerable communities across Peru  by  promoting  sustainable  development.  Our  holistic  approach focuses on improving basic services essential to lifting people out of poverty, both in terms of economic stability and overall well-being. This vision has shaped our four key areas of expertise: ecosystem restoration, renewable energy, water and sanitation, and public health. 

In 2025, EcoSwell operated across the provinces of Talara, Ayabaca, and  Nazca  in  Peru.  Our  efforts  directly  impacted  individuals  in  the communities of Lobitos, Piedritas, Síchez-Folchez, Buenos Aires and Negritos in Talara province, as well as Suyo in Ayabaca. When factoring in the broader effects of our work—both in empowering communities and protecting  natural  resources—our  reach  extends  just  under  100,000 beneficiaries. Our main achievements for 2025 across our key areas of expertise, as well as some of our other initiatives, are summarised below: 

## **Renewable Energy** 

Energy Resilient Medical Centres Following the successful partnership between the French cable company ‘Nexans’ and their foundation, the local government and other corporate partners, in installing a Solar PV system for the Medical Centre in Talara in 2023, we were awarded follow-on projects for two additional Solar PV installations in Medical Centres. In 2025 we began work on the renewable energy project at the Buenos Aires Medical Centre. We completed the electrical distribution and lightning protection systems, preparing the site for the installation of a 9.36 kWp Solar PV system in 2026. The project is expected to benefit more than 10,000 people. We also visited the four medical posts in Cajamarca as part of a project supported by the NextEnergy Foundation and the Regional Government of Cajamarca. We gathered information for solar site assessments and energy consumption analyses, interviewed key staff members at each medical post and took measurements to prepare technical drawings. These assessments will guide the design of systems tailored to each facility’s energy needs, with a preliminary combined Solar PV capacity of 23.04 kWp. The project is expected to benefit more than 5,000 people by providing more reliable electricity for essential medical services in these remote communities. Solar distillers With our volunteer interns we have continued developing, testing and researching prototypes of solar distillers made from local materials. These designs, shared under a creative common framework, allow communities without technical expertise to benefit from a sustainable and accessible solution to distil freshwater from seawater. We are still working on this R&D initiative with the aim of reaching a feasible and scalable solution. Improved Cookstoves We have designed and implemented five Improved Cookstoves to support families in extreme poverty that cook using firewood. These improved cookstoves offer a clean way to cook, using a third of the firewood, cooking in half the time and vastly improving air quality within households. We will continue to build more of these cookstoves every year to support the families that need it most. 

March **2012** 

**TAR** 

3 



Section D                      Achievements and performance 

**Ecosystem Restoration** Ecotourism Initiatives As part of our long-term commitment to improving local environment, EcoSwell has maintained ecotourism trails in 2 localities: Negritos and Piedritas. Throughout 2025 a community ecotourism, as part of the GiZ-EbAMar project in the town on Negritos, has been maintained. This locality south of Talara city features a biodiverse marine-coastal environment. 3.7km of hiking and bird-watching trails now exist here within an area of approximately 100 hectares of natural habitat in the community. This area is part of a bigger one (913 ha) that was recently declared as an Environmental Conservation Area – “ACA Balcones” – by the Provincial Municipality of Talara and managed by the District Municipality of Negritos. The existing community ecotourism trails in the locality of Piedritas, which had been expanded in 2024, have been also maintained during 2025. The maintenance work has been focussed on the 1.9km trail to the ‘Punta Malacas’ wetlands, covering a total area of 70 hectares of land that is being preserved by local people. This is of critical importance given the acute ecological crisis in the Tropical Dry Forest ecosystem, where 90% has already been historically lost. In addition this creates local income for residents in these remote towns, while respecting their traditional custodianship of the land. Reforestation 

Our long-running tree-planting program in Lobitos also continued successfully throughout 2025. An additional 260 seedlings were planted in 2025, bringing the total to 4,318 since 2015. 

## **Water and Sanitation** 

Bioremediation In 2025 we continued the work to address wastewater spills and contamination within Lobitos district. There is currently no centralized wastewater treatment in Lobitos and domestic wastewater spills raw, without treatment, into the open environment in different random spots around town, posing a severe threat to ecosystem and human health. 

We carried out a comprehensive study mapping out all spill points around town (13 so far) and evaluated each site according to technical feasibility and environmental impact factors, using engineering techniques such as (weighted scoring modelling) to arrive at the recommended site for an intervention and solution with a biodigester septic tank system. The whole implementation of this system was also designed and planned in detail in order to be executed later in 2026. This would serve more than 40 houses/families of a whole neighborhood in Lobitos as well as help to learn and understand the management and maintenance of such systems, ownership transfer to the local community and potential for scaling and replication. 

## Groundwater Surveying 

We continued the ongoing groundwater geophysical survey project and finished mapping the “quebrada” in the goat-herding community of San Jacinto de Síchez in Lobitos. A comprehensive report with all the findings of the survey was produced, including the recommendation for a 

March **2012** 

**TAR** 

4 



Section D                      Achievements and performance community borehole location as a conclusion from the geophysical data and results gathered (estimated depth to water table, estimated groundwater salinity, distance from the community). This was shared with the community and also with regional authorities who were engaged in the process and who claimed they could donate the drilling of the borehole in the near future. **Public health** EcoSwell’s medical volunteer internship sees our volunteer interns working alongside local staff in the Lobitos Medical Centre in treating the local population. In 2025, 7 volunteer interns conducted their placements there, for an overall total of 21.9 volunteer weeks. 299 residents were directly benefited as patients at the centre during this time, including medical and dental care. Furthermore, EcoSwell also donated gloves, surgical equipment, and other medical supplies to the Lobitos Medical Centre. During 2025 we began planning a mission to take place in 2026, with UK reconstructive surgery doctors, and had a visit from two UK doctors to carry-out a scoping trip, including the representative of Bfirst, (British Foundation for Reconstructive Surgery). The trip was a success and laid the foundations for the mission to take place in 2026 in the Hospital of Santa Rosa in Piura and in Loayza, of Lima. Patients will be treated and there will be a knowledge exchange between the UK and Peruvian surgeons. **Partners and volunteers** In 2025, we engaged various universities across Europe and North and South America, as well as existing partners from 2024. We also saw the continuation  of  our  volunteer  internships  programme,  with  80  people completing volunteering placements in Peru in 2025. **Fundraising** As part of our fundraising initiatives, we obtained donations from friends and individuals who support our cause. We raised a total of GBP 3,948. during this period for EcoSwell UK. 

## **Section E                    Financial review** 

We aim to have at least 10% of EcoSwell’s UK total income as reserves **Brief statement of the** for now. **charity’s policy on reserves Details of any funds materially in deficit Further financial review details (Optional information)** The main source of funding for EcoSwell UK came from fundraising. You **may choose** to include additional information, where relevant about: ● the charity’s principal sources of funds (including any fundraising); 

March **2012** 

**TAR** 

5 



● how expenditure has supported the key objectives of the charity; 

● investment policy and objectives including any ethical investment policy adopted. 

## **Section F                     Other optional information** 

## **Section G                    Declaration** 

**The trustees declare that they have approved the trustees’ report above.** 

**Signed on behalf of the charity’s trustees** 

**Signature(s) Full name(s)** Michael Alderson **Position (eg Secretary, Chair, etc)** Advisor **Date** 04/11/26 

March **2012** 

**TAR** 

6 



Account Activity Account Name: CafCash Account Account Type: CAF_CASH Bank's Name: CafCash Account Account Number: 00029079 

Currency: GBP Activity Criteria: All transactions between 01/01/2025 and 31/12/2025. Credit and Debit 

Account Transactions **Value Date Description** 02/01/2025 FP ECOSWELL Parkins Benjamin 02/01/2025 FP MNTHLY DIRECT DBIT J BENNETT 06/01/2025 FP RegularDonation EB EDWARD BEARDSMORE 15/01/2025 Monthly Account Fee 03/02/2025 FP ECOSWELL Parkins Benjamin 03/02/2025 FP MNTHLY DIRECT DBIT J BENNETT 06/02/2025 FP RegularDonation EB EDWARD BEARDSMORE 17/02/2025 Monthly Account Fee 19/02/2025 Online transfer to Emilie Millicent Mackeown flight 19/02/2025 Online transfer to Wendy Lenton 19/02/2025 Online transfer to Bingyou Yang 03/03/2025 FP ECOSWELL Parkins Benjamin 03/03/2025 FP MNTHLY DIRECT DBIT J BENNETT 04/03/2025 Online transfer to Samuel Hand Ecoswell expense Feb 25 06/03/2025 FP RegularDonation EB EDWARD BEARDSMORE 17/03/2025 Monthly Account Fee 26/03/2025 INTEREST TO DATE 01/04/2025 FP ECOSWELL Parkins Benjamin 01/04/2025 FP MNTHLY DIRECT DBIT J BENNETT 07/04/2025 FP RegularDonation EB EDWARD BEARDSMORE 15/04/2025 Monthly Account Fee 01/05/2025 FP ECOSWELL Parkins Benjamin 01/05/2025 FP MNTHLY DIRECT DBIT J BENNETT 06/05/2025 FP RegularDonation EB EDWARD BEARDSMORE 15/05/2025 Monthly Account Fee 20/05/2025 Online transfer to SIENNA BASSI Ecoswell expense May 25 27/05/2025 MICHAEL PAUL ALDERSON 1003255784592 USD 2682.00@1.3398 27/05/2025 FX Payment Charge 02/06/2025 FP ECOSWELL Parkins Benjamin 02/06/2025 FP MNTHLY DIRECT DBIT J BENNETT 06/06/2025 FP RegularDonation EB EDWARD BEARDSMORE 16/06/2025 Monthly Account Fee 26/06/2025 Interest to Date 01/07/2025 FP Parkins Benjamin ECOSWELL 01/07/2025 FP J BENNETT MNTHLY DIRECT DBI 07/07/2025 FP EDWARD BEARDSMORE RegularDonation E 08/07/2025 Online transfer to Bingyou Yang Birmingham fair 15/07/2025 Monthly Account Fee 24/07/2025 SWIFT Payment - Charges 24/07/2025 MICHAEL PAUL ALDERSON 1003255784592 USD 2154@1.3399 01/08/2025 FP J BENNETT MNTHLY DIRECT DBI 01/08/2025 FP Parkins Benjamin ECOSWELL 06/08/2025 FP EDWARD BEARDSMORE RegularDonation E 14/08/2025 FP J DYSON EDITORS FOR IMPAC 15/08/2025 Monthly Account Fee 01/09/2025 FP J BENNETT MNTHLY DIRECT DBI 01/09/2025 FP Parkins Benjamin ECOSWELL 01/09/2025 FP JUSTGIVING 4681348 ECOSWELL 08/09/2025 FP EDWARD BEARDSMORE RegularDonation E 



08/09/2025 FP JUSTGIVING 4681796 ECOSWELL 15/09/2025 Monthly Account Fee 16/09/2025 FP JUSTGIVING 4709394 ECOSWELL 26/09/2025 Interest to Date 01/10/2025 FP J BENNETT MNTHLY DIRECT DBI 01/10/2025 FP Parkins Benjamin ECOSWELL 06/10/2025 FP EDWARD BEARDSMORE RegularDonation E 15/10/2025 Monthly Account Fee 27/10/2025 FP JUSTGIVING 4794330 ECOSWELL 30/10/2025 Online transfer to Bingyou Yang Ecoswell expense 03/11/2025 FP J BENNETT MNTHLY DIRECT DBI 03/11/2025 FP Parkins Benjamin ECOSWELL 03/11/2025 FP JUSTGIVING 4803562 ECOSWELL 06/11/2025 FP EDWARD BEARDSMORE RegularDonation E 17/11/2025 Monthly Account Fee 24/11/2025 FP Stripe Payments UK ZEFFY LIMITED 25/11/2025 FP JUSTGIVING 4845288 ECOSWELL U 01/12/2025 FP J BENNETT MNTHLY DIRECT DBIT 01/12/2025 FP Parkins Benjamin ECOSWELL 01/12/2025 FP JUSTGIVING 4855810 ECOSWELL U 08/12/2025 FP EDWARD BEARDSMORE RegularDonation EB 09/12/2025 FP JUSTGIVING 4868683 ECOSWELL U 15/12/2025 FP JUSTGIVING 4878415 ECOSWELL U 15/12/2025 Monthly Account Fee 19/12/2025 BACS Credit MUSGRAVE LIMITED B 495584 23/12/2025 SWIFT Payment - Charges 23/12/2025 ECOSWELL 0863132334487 USD 29/12/2025 Interest to Date 

Carried Forward 



|**Debit**||**Credit**||**Book Balance**||
|---|---|---|---|---|---|
||||30.00||5863.84|
||||10.00||5873.84|
||||5.00||5878.84|
||5.00||||5873.84|
||||30.00||5903.84|
||||10.00||5913.84|
||||5.00||5918.84|
||5.00||||5913.84|
||980.17||||4933.67|
||10.00||||4923.67|
||106.25||||4817.42|
||||30.00||4847.42|
||||10.00||4857.42|
||80.05||||4777.37|
||||5.00||4782.37|
||5.00||||4777.37|
||||2.70||4780.07|
||||30.00||4810.07|
||||10.00||4820.07|
||||5.00||4825.07|
||5.00||||4820.07|
||||30.00||4850.07|
||||10.00||4860.07|
||||5.00||4865.07|
||5.00||||4860.07|
||4.05||||4856.02|
||2001.79||||2854.23|
||25.00||||2829.23|
||||30.00||2859.23|
||||10.00||2869.23|
||||5.00||2874.23|
||5.00||||2869.23|
||||2.10||2871.33|
||||30.00||2901.33|
||||10.00||2911.33|
||||5.00||2916.33|
||103.91||||2812.42|
||5.00||||2807.42|
||25.00||||2782.42|
||1607.58||||1174.84|
||||10.00||1184.84|
||||30.00||1214.84|
||||5.00||1219.84|
||||1369.88||2589.72|
||5.00||||2584.72|
||||10.00||2594.72|
||||30.00||2624.72|
||||174.17||2798.89|
||||5.00||2803.89|





||135.84|2939.73|
|---|---|---|
|5.00||2934.73|
||91.69|3026.42|
||1.23|3027.65|
||10.00|3037.65|
||30.00|3067.65|
||5.00|3072.65|
|5.00||3067.65|
||53.05|3120.70|
|616.70||2504.00|
||10.00|2514.00|
||30.00|2544.00|
||48.75|2592.75|
||5.00|2597.75|
|5.00||2592.75|
||30.00|2622.75|
||72.67|2695.42|
||10.00|2705.42|
||30.00|2735.42|
||107.39|2842.81|
||5.00|2847.81|
||282.38|3130.19|
||157.78|3287.97|
|5.00||3282.97|
||877.10|4160.07|
|25.00||4135.07|
|934.00||3201.07|
||1.47|3202.54|
|6579.50|3948.20|3202.54|



