
## **Trustees' Annual Report for the period** 

||Period start date|Period start date|||Period end date|Period end date||
|---|---|---|---|---|---|---|---|
||Day|Month|Year||Day|Month|Year|
|**From**|01|01|2020|**To**|31|12|2020|



## Section A                        Reference and administration details 

**Charity name** 

Druitt Hall Community Association 

**Other names charity is known by** 

- 

**Registered charity number (if any)** 1157590 

**Charity's principal address** 

Druitt Hall 

High Street Christchurch **Postcode BH23 1AB** 

## **Names of the charity trustees who manage the charity** 

|1<br>2<br>3<br>4<br>5<br>6|**Trustee name**|**Office (if any)**|**Dates acted if not for whole**<br>**year **|**Name of person (or body) entitled**<br>**to appoint trustee (ifany)**|
|---|---|---|---|---|
||Christopher Guest|Chair|||
||Martin Vieyra|Treasurer|||
||Carolyn Guest||||
||Katie Hawksworth||||
||||||
||||||



## **Names of the trustees for the charity, if any, (for example, any custodian trustees)** 

**Name Dates acted if not for whole year** 

## **Names and addresses of advisers (Optional information)** 

**Type of adviser Name Address** 

## **Name of chief executive or names of senior staff members (Optional information)** 

**TAR** 

DHCA - 2019 

1 



**Section B              Structure, governance and management** 

## **Description of the charity’s trusts** 

Type of governing document 

- (eg. trust deed, constitution) 

Constitution 

How the charity is constituted 

- (eg. trust, association, company) 

Charitable Incorporated Organisation 

Trustee selection methods 

Appointed by Trustees (eg. appointed by, elected by) 

## **Additional governance issues (Optional information)** 

You **may choose** to include additional information, where relevant, about: 

- policies and procedures adopted for the induction and training of trustees; 

- the charity’s organisational structure and any wider network with which the charity works; 

- relationship with any related parties; 

- trustees’ consideration of major risks and the system and procedures to manage them. 

The identification and allocation of funds reserved for specific purposes was instituted in the accounts.  A Reserves Policy statement was formulated by the Treasurer including in particular the recommended contingency reserve. 

A change of electricity supplier was made.  A problem with the finalisation of the charges from the previous supplier persisted beyond the end of the year (the supplier being unable to provide correct account). 

CoronaVirus 

Following the introduction of various precautionary procedures, the Trustees resolved to close the facility to the public from 20th March.  This was followed 3 days later by a government order to ‘lockdown’. 

Advice from BCP and from DCA webinars was followed through the year. Local authority grant monies were received to assist with public health measures. 

The requirement for H&S risk assessments from hirers was extended in respect of the pandemic.  A questionnaire was sent to hirers concerning plans for a return to operation: re-opening was possible for a short period during the year. 

Statutory Policies were reviewed and updated as necessary (eg Fire Risk Assessment, Legionnaires Disease and, especially, Covid-19). Fire exit doors were upgraded, de-scaling anodes were renewed in the water heaters and background heating added to one store area. 

Annual ‘PAT’ testing and servicing of fire extinguishers was carried out.  Locks to the toilet doors were added to enable their use to be restricted. 

The Friends of Druitt Gardens became a hirer of the former Markham Room area, developing it as a secure ‘wildlife education area’. 

Four trustee meetings were held, maintaining an emphasis on collective decision-making and responsibility.  A planned fifth meeting was postponed owing to the further lockdown late in the year. 

The Landlord, Christchurch Town Council, had agreed to budget for replacement windows and had commissioned a surveyor’s report on the condition of the building. 

**TAR** 

DHCA - 2019 

2 



## **Section C                    Objectives and activities** 

**Summary of the objects of the charity set out in its governing document** 

To benefit the residents of Christchurch (Dorset) and neighbouring areas, without distinction, by associating together the said residents, and voluntary and other organisations in a common effort to provide facilities for recreation, health and fitness, education, leisure time occupation, community meetings and activities, with the objective of improving quality of life and enhancing community activities. To accumulate funds for the building of a replacement Community Hall centred on the footprint of the existing hall and to build such when funds allow. _(as stated in the constitution)_ Protects and enhances the existing building The Trustees gave due regard to guidance issued by the Charity Commission in formulating policy and in exercising their powers and duties, notably this year in the administration of H&S measures in respect of the pandemic. The Trustees continued to demonstrate there is a financially-sustainable demand for this facility, operating within the terms of the lease. 

The conversion of a storage room into an equipment store was completed. The Town Council agreed to budget for replacement of the metal windows subject to a surveyor’s report on the fabric of the building. The water-penetration through the rear wall of the hall had been cured by volunteers’ efforts. 

Runs the hall as a community centre 

**Summary of the main activities undertaken for the public benefit in relation to these objects (include within this section the statutory declaration that trustees have had regard to the guidance issued by the Charity Commission on public benefit)** 

The regular testing of equipment, fire detection, CCTV and security installations, safety lighting etc continued.  Consultation with hirers continued, both at a formal meeting and informally on a week-to-week basis. 

Groups using the hall at the end of 2020 had reduced temporarily: not every hirer wished to continue during the Covid restrictions.  The Trustees advised all groups that their regular ‘slot’ would be held for their return. At the end of 2020 the groups included: 

- Twice-weekly table tennis club (‘on hold’) 

- Local resident's association (monthly) (‘on hold’) 

- A weekly youth drama group 

- Local Labour Party meetings monthly) (‘on hold’) 

- Two weekly fitness classes 

- Women's lnstitute x 2 groups (monthly) (‘on hold’) 

- Aviation society meeting (monthly) (‘on hold’) 

- Local produce / craft market (weekly) 

- Tabletop / craft markets (one weekly, one monthly) 

- Life-drawing class (monthly) (‘on hold’) 

- Psychic readings (one to one, weekly) (‘on hold’) 

- Youth Taekwondo group (weekly) 

- Youth karate group (weekly) 

- Brendoncare 'Variety Club' for older folk (weekly) (‘on hold’) 

- Women's League of Friendship (fortnightly) (‘on hold’) 

- Health & Well-being Fair (monthly) (‘on hold’) 

- Sundry / occasional resident's association AGMs, mediation meetings, private parties, drama rehearsals 

Operation of the hall continued to require careful and proper management of maintenance and improvement works so as to minimise disruption to hirer's 

**TAR** 

DHCA - 2019 

3 



activities and health and safety risks to anyone present in the facility. 

## **Additional details of objectives and activities (Optional information)** 

As noted above, time given by volunteers continues to make a crucial contribution to the maintenance and improvement of this facility. 

The Trustees are aware of the need to encourage participation by more volunteers and the need for additional skills in (eg) grant-funding. It is planned to fund and out-source more of the maintenance / improvement works in future. 

You **may choose** to include further statements, where relevant, about: 

- policy on grantmaking; 

- policy programme related investment; 

- contribution made by volunteers. 

**TAR** 

DHCA - 2019 

4 



## Section D                      Achievements and performance 

**Summary of the main achievements of the charity during the year** 

Retention of existing users and the gaining of some additional hirers was achieved.  New and frequent enquiries about hiring continued. A volunteer continued to carry out the monthly safety / maintenance checks (smoke alarms etc) and to maintain a log of these checks. 

Some funds continued to be generated by participation in the BH Lottery. During the pandemic, whether open or during ‘lockdown’ the hall and hirers were successfully managed in respect of both hire conditions and H&S measures and communication with hirers was maintained very well. 

**TAR** 

DHCA - 2019 

5 



## **Section E                    Financial review** 

## **Brief statement of the** 

**charity’s policy on reserves** 

It remains the charity's policy to hold in reserve as a minimum, an amount equivalent to 6 months' operating costs (£10,800 was in hand at end of 2020).  Charity Commission guidance is to hold a reserve equivalent to between 4 and nine months’ of operating costs. 

The amount held in respect of returnable deposits (liability) for keys and a potential liability for historical electricity charges was £2,770. 

The amount of £100 was reserved in a find for possible installation of a PA system, £187 in respect of a planned defibrillator installation. 

The amounts of £3,199 and £4,675 were respectively reserved for the improvement of a storeroom and for remaining repair and decoration works to external walls. 

The amount of £1,462 was reserved for repairs and varnishing to the hall’s woodblock flooring.  The amount of £750 was reserved for improvements to the end-store, £100 for lobby improvements, £170 for works in the meeting room, £650 for improvements to the loft storage, and a further £500 for the cost of removing remaining moss from the roof. 

A dedicated reserve of £11,076 in respect of Covid-19 measures was in hand. 

The amount held at the bank at the end of the year was £38,169 

The construction of a replacement hall remains a long-term aim of the charity’s constitution but other, more immediate, improvements to the existing are to the foremost. 

## **Details of any funds materially in deficit** 

None 

## **Further financial review details (Optional information)** 

You **may choose** to include additional information, where relevant about: 

- the charity’s principal sources of funds (including any fundraising); 

- how expenditure has supported the key objectives of the charity; 

- investment policy and objectives including any ethical investment policy adopted. 

Aside from donations and grants, both of which are usually rare, the sole income from which to meet operating costs remains that received from hires. However being liable to business rates has had the benefit of receiving substantial grant-assistance from the local authority.  These monies have been carefully managed and were very welcome. 

Hire income has, of course, decreased substantially over the year but so have the regular variable outgoings.  Having no staff, in particular, has meant no liability to employments costs. 

Together these factors have contributed to increased liquid funds being held. 

The Trustees remain mindful that large spending of funds on work to the existing building may not be to the public benefit, given the age of the building and the stated second objective in the constitution.  The Landlord’s anticipated surveyor’s report will inform decisions in this respect, pending which some of the planned works are put ‘on hold’. 

**TAR** 

DHCA - 2019 

6 



## **Section F                     Other optional information** 

Our aims for the coming year (largely carried forward from last year) are: 

- to return to full operation as soon as can safely be achieved 

- to review and determine whether certain services (eg janitorial) should be ‘out-sourced’ rather than rely on the current volunteers 

- to identify and obtain additional skills at trustee- (or consultant-) level in respect of funding and marketing 

- to further improve the facilities both for hirers and DHCA 

- to improve the fabric of the building in co-operation with the landlord (the Town Council) 

- to support the Friends of Druitt Gardens in their aims for the gardens 

## **Section G                    Declaration** 

**The trustees declare that they have approved the trustees’ report above.** 

**Signed on behalf of the charity’s trustees** 

## **Signature(s)** 



**Full name(s)** Christopher Roy Guest 

Carolyn Jane Guest 

**Position (eg Secretary, Chair,** Chair Trustee **etc) Date** 5/7/2021 

**TAR** 

DHCA - 2019 

7 



||**Druitt Hall Community Association**|**Druitt Hall Community Association**|**Druitt Hall Community Association**|**Druitt Hall Community Association**|**Druitt Hall Community Association**|**1157590**|**1157590**|**1157590**|**CC16a**|
|---|---|---|---|---|---|---|---|---|---|
||**For the period**<br>**from**||01/01/2020<br>Period start date||**To**||31/12/2020<br>Period end date|||
|||||||||||
|**Section A Receipts and payments**||||||||||
|**A1 Receipts**|**Unrestricted**<br>**funds**<br>**to the nearest      £**||**Restricted**<br>**funds**<br>**to the nearest £**||**Endowment**<br>**funds**<br>**to the nearest £**||**Total funds**<br>**to the nearest £**||**Last year**<br>**to the nearest £**|
|Donation|**60**||**1,800**||**-**||**1,860**||**150**|
|Hire of Hall|**11,280**||**-**||**-**||**11,280**||**22,885**|
|Electricity- Transfer from U3A|**385**||**-**||**-**||**385**||**309**|
|FundraisingEvents|**-**||**-**||**-**||**-**|||
|BH Coastal Lottery|**44**||**-**||**-**||**44**||**19**|
|General|||**-**||**-**||**-**||**141**|
|Covid-19 Grants|||**11,334**||**-**||**11,334**||**-**|
||**-**||**-**||**-**||**-**||**-**|
|**_Sub total_**_(Gross income for_<br>_AR)_|<br> **11,768**||**13,134**||**-**||**24,902**||**23,504**|
|||||||||||
|**A2 Asset and investment sales,**<br>**(see table).**||||||||||
||**-**|||||||||
||**-**<br>||||||||**-**|
|**_Sub total_**|**-**||||||||**-**|
|**_Total receipts_**<br>**A3 Payments**||||||||||
||||||||||**23,504**|
|||||||||||
|Repairs & Maintenance|**280**||||||||**13,633**|
|Cleaning& Consumables|**1,522**||||||||**2,366**|
|Telephone, Internet & Postage|**419**||||||||**999**|
|Water & Sewerage|**253**||||||||**505**|
|Insurance & Safety|**597**||||||||**1,146**|
|PRS_PPL Licence|**-**||||||||**108**|
|Electricity|**1,577**||||||||**2,515**|
|Admin & Stationery|**2,489**||||||||**1,665**|
|Improvements|**110**||||||||**600**|
|General|**484**||||||||**-**|
|Furniture|||||||||**-**|
|Covid-19 Consumables||||||||||
|FODG/WEA|**390**|||||||||
|Business Rates|**124**||||||||**-**|
|**_Sub total_ **|**8,246**||||||||**23,537**|
|||||||||||
|**A4 Asset and investment**<br>**purchases (see table)**<br>**,**||||||||||
||**-**||||||**-**|||
||**-**||||||**-**|||
|**_Sub total_ **|**-**||||||**-**||**-**|
|**_Total payments_**<br>**_Net of receipts/(payments)_**<br>**A5 Transfers between funds**<br>**A6 Cash funds last year end**<br>**_Cash funds this year end_**||||||||||
||||||||||**23,537**|
|||||||||||
||**3,521**||||||**14,201**||**-                     33**|
||**-                  4,202**||||||**-**||**-**|
||**2,411**||||||**23,968**||**23,967**|
||**1,730**||||||**38,169**||**23,934**|



CCXX R1 accounts (SS) 

Druitt Hall Community Association - Accounts 2019 - 1 

05/07/2021 



## **Section B Statement of assets and liabilities at the end of the period** 

|**Categories**<br>**B1 Cash funds**<br>**B2 Other monetary assets**<br>**B3 Investment assets**<br>**B4 Assets retained for the**<br>Signed by one or two trustees on<br>behalf of all the trustees<br>**B5 Liabilities**<br>**charity’s own use**|Middle Store (In progress)<br>Repair/Varnish Hall Floor<br>Completion of Repairs/ Redecs to<br>**External Walls**<br>PA System<br>Defibrillator<br>Cash at Bank<br>Cash at Bank - Emergency Operating<br>Reserve<br>Cash at Bank - Planned Expenditure<br>**Details**<br>Covid-19 Fund<br>Loft Improvements<br>Liabilities - Late Power Bills, Key Deposits<br>**_Total cash funds_**<br>(agree balances with receipts and payments<br>account(s))<br>Redecs, Cover Floor - End-store<br>Remove Moss from Roof<br>Gutter, Canopy, Fascias Repair and<br>Maintenance<br>External, General<br>Lobby Maintainance/Improvements<br>Meeting Room<br>**Details**<br>**Details**<br>**Details**<br>Signature<br>Electricity liability<br>Key deposits<br>**Details**|**Unrestricted**<br>**funds**<br>**Restricted**<br>**funds**<br>**to nearest £**<br>**to nearest £**<br>**1,730**<br>**-**<br>**-**<br>**10,800**<br>**100**<br>**187**<br>**3,199**<br>**1,462**<br>**3,100**<br>**975**<br>**750**<br>**100**<br>**170**<br>**11,076**<br>**650**<br>**600**<br>**500**<br>**-**<br>**2,770**<br>**1,730**<br>**36,439**<br>OK<br>OK<br>**Unrestricted**<br>**funds**<br>**Restricted**<br>**funds**<br>**to nearest £**<br>**to nearest £**<br>**-**<br>**-**<br>**-**<br>**-**<br>**-**<br>**-**<br>**Fund to which**<br>**asset belongs**<br>**Cost (optional)**<br>**-**<br>**-**<br>**-**<br>**Fund to which**<br>**asset belongs**<br>**Cost (optional)**<br>**-**<br>**-**<br>**-**<br>**Fund to which**<br>**liability relates**<br>**Amount due**<br>**(optional)**<br>Restricted<br>**2,520**<br>Restricted<br>**230**<br>Print Name<br>Christopher RoyGuest|**Endowment**<br>**funds**<br>**to nearest £**|
|---|---|---|---|
||||**-**|
||||**-**|
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
|||||
||||**-**|
||||**-**|
||||OK|
||||**Endowment**<br>**funds**<br>**to nearest £**|
||||**-**|
||||**-**|
||||**-**|
||||**-**|
||||**Current value**<br>**(optional)**|
||||**-**|
||||**-**|
||||**-**|
||||**Current value**<br>**(optional)**|
||||**-**|
||||**-**|
||||**-**|
||||**When due**<br>**(optional)**|
|||||
|||||
|||||
|||||
|||||
|||||
||||Date of<br>approval|
|||Christopher RoyGuest|22/3/2021|
|||||



CCXX R2 accounts (SS) 

Druitt Hall Community Association - Accounts 2019 - 2 

05/07/2021 

