# **Bearwood Community Centre Association Registered Charity No. 1118753 Annual Report for 2020** 

**Management Committee:** 

**Chair Vacant Vice Chair Marcelino Scott-Farnell Treasurer Vacant Secretary Vacant Membership Secretary Vacant** 

**Les Fountain Pip James Lois Taylor Celia Mitchener Roger Luffman David Brown** 

**BCP Council Rep. Cllr Richard Burton** 

**Centre Manager Lynn Rowe Acting Secretary Lynn Rowe Acting Membership Secretary Lynn Rowe Minutes Secretary                         Lesley Scotter** 

1 



**Bearwood Community Centre Association (BCCA)** 

## **Registered Charity No. 1118753** 

## **Annual Report for 2020** 

The Bearwood Community Centre Association Management Committee is responsible for the Community Centre building under the terms of a lease with BCP Council (Formerly - Poole Borough Council).  This entails: 

- the day to day running of the centre 

- managing the Association’s finances and administration 

- a continuing programme of works to maintain and improve the physical condition of the premises 

- continuing to  make  the  Centre  more  accessible  and engaged with  the  local community 

In 2020, despite the loss of 3 out of 9 of the Trustees, the Association continued to manage  the  growing  activities  effectively  and  efficiently  in  the  Centre  and  to develop what can be offered to the local community. 

In January & February the Bearwood Community Centre maintained the continuation of regular activities, with the existing groups and the number of visitors coming to the centre every week.  Functions such as children’s parties and family celebrations had a record number of bookings for the coming months and because of this, the Association’s operating income was predicted healthy and continuing its steady increase,  providing  more  funds  to  re-invest  in  improving  the  facilities  and equipment available to groups and individuals using the Centre. 

COVID caused the centre to be closed in March, then, in line with Government restrictions and recommendations from April through to December was a mixed period of activities, with a further shutdown at the end of 2020. 

The Centre’s staff are a Centre Manager, responsible for bookings and the general management of the centre as well as the relationships with all the groups using the premises and a cleaner, both are part-time roles. 

The following pages of this report detail the main areas of activity during 2020.  The major achievements in 2020 have been to: 

- continue the high standard of maintenance and improvements on the premises 

- invest further in the equipment within the Centre. 

- continue to work in partnership with the Bearwood Social Club (BSC) 

There is still potential for the Centre to grow and develop further and a lot of desire and need within the area for even better facilities, activities, and events to meet the needs of the Community, whose ages range from Toddlers to the Senior members. 

The vision of creating a vibrant and active Community Centre of which the residents of Bearwood can be proud becomes more of a reality each year and is now well on the way to achieving this aim. 

2 



The Association still set their sights higher and continue to consider how to expand and what can be done for more people to benefit from a first-class centre. 

## **Administration of the Association and the Community Centre** 

A key part of this activity is to efficiently manage the administration of the centre to support its continuing growth and to meet the various demands placed on the Centre as a public venue and as a Registered Charity. 

## **Management Committee & Trustees** 

The Management Committee also act as the Trustees of the Association. 

## **Honorary Officers and other committee positions** 

Due  to  the  absence  of  Chair,  Secretary  and  Treasurer  it  fell  upon  the  Centre Manager  to  perform  essential  functions  during  the  pandemic  to  maintain  the running of the Centre. 

## **Meetings** 

Due to a National Lockdown, there was no AGM in 2020. 

There  were  3  meetings  of  the  Management  Committee  during  2020,  (January, February & August) the proceedings of which have been recorded by the Minutes Secretary in signed minutes. 

The sub committees did not meet in 2020. 

## **Membership** 

The  annual  membership  was  separated  from  the  Social  Club.   The  annual membership fee for 2020 is £5 and comprises mainly of members who hire facilities at  the  Centre.   Whilst  the  Social  Club  now  has  a  separate  membership,  they continue to contribute £5 per member to the Community Centre.   This contribution was waived for 2020. 

## **Organisation Structure and Constitution** 

The  Association  is  an  unincorporated  association  and  Registered  Charity  no. 1118753 as of April 2007.  The Association operates in accordance with our revised Constitution which was approved by members at the AGM in April 2006. 

## **Engagement with supporting organisations** 

The BCCA is conscious that it will not be able to achieve the long term aims without the active involvement and support of a range of agencies that advise, guide, and facilitate any development.  To this end the Association are actively engaged with various departments at BCP Council as well as Community Action Network (CAN). Membership of CAN has continued to access all the advice and support needed for the management of an active public building. 

**Licensing** 

3 



Throughout the year the Centre has been licensed with the local authority to offer all forms of regulated entertainment in the Community Centre.  The Community Centre does not hold an alcohol licence, feeling that it is sufficient for this to be restricted to the Social Club, however it is  registered with the local authority as a food business able to serve tea, coffee, drinks and snacks in the refurbished lounge and youth centre. 

## **Lease** 

BCCA agreed and signed a 35-year lease on the building in March 2007 and have a good working relationship with BCP Council to ensure both parties are abiding by the terms of the lease and fulfilling the necessary requirements for the maintenance and upkeep of the building. 

## **Insurance cover** 

Insurance  cover  for  the  premises,  contents  and  liabilities  has  been  in  effect throughout the year for both the Community Centre and Social Club parts of the building, including Public Liability cover of £10m as required by the Council’s lease. Review of insurance cover was carried out and is in place until 2021, when it will go out to tender. 

## **Policies** 

The  Association  currently  has  a  Smoking  Policy,  Environmental  Policy,  Equal Opportunities  Policy  and Expenditure  Policy.   Further  policies  will  be  agreed  as required. 

## **Relationship with Bearwood Social Club** 

There were no meetings with the Social Club Committee during 2020.  The Centre Manager  worked  in  constant  communication  with  the  Social  Club  Secretary, Treasurer  and  Bar  Manager  throughout  2020  as  restrictions  and  advice  were changing constantly. 

## **Meeting our legal obligations** 

The  Management  Committee  are  aware  of  their  responsibilities  in  running  the centre in compliance with the wide range of laws and regulations influencing the Association’s activities, including Charity Law, Licensing Regulations, Health and Safety Law, Fire Safety, Environmental Health, building regulations, the Disability Discrimination  Act  and  Data  Protection  Act.   Compliance  with  these  laws  and regulations has influenced the Committee’s discussions and decisions throughout the year and have sought assistance from CAN, the BCP Council and other bodies where necessary. 

The committee is conscious that the need for legal advice and guidance will be ongoing and will take this up when required. 

All these activities have been essential for ensuring the proper and transparent governance of the Association in support of their position as a registered charity. 

## **Pandemic Activity** 

4 



Disabled Access 

Plans for building a disabled access/ramp from the car park to the main entrance continued in 2020 after planning permission was granted in January. A Funding application to Entrust was successful to the value of £25,000 towards the cost of building it. 

BCP  Council  were  contacted at the  start  of  lockdown  requesting  permission  to proceed with  the  building  of  the  disabled  ramp as the  Centre  was  closed and funding was in the BCCA’s account, however an amendment to the Lease was required to cover a metre of neglected shrubbery in the corner of the Council’s car park.   For  whatever  reason,  permission  was  refused,  which  resulted  in  a  very frustrating year trying to enhance a BCP Council property (at no cost to them) for the access of disabled users. 

Virtually all of 2020 was taken up chasing both the BCP Council and BCCA solicitors. It soon became an overly protracted and prolonged procedure with both solicitor’s blaming each other for not receiving the necessary information.  Both Solicitors were asked to copy BCCA into all correspondence, which neither complied, so it was extremely difficult to establish exactly what was being done and by whom.  COVID was continually used as the excuse for emails not being answered or received and whenever either were called the relevant parties were never available as everyone was working from home. 

## All Other Tasks Completed 

Appointed Sharon Raymond to address the absence of a Treasurer. 

Change of Bank Account and signatories. 

Utility suppliers changed and all credits refunded to the Bank Account. 

Main Hall floor resurfaced. 

Main toilets, corridor & inner porch flooring replaced. 

Deep cleaning of Centre. 

Decorated the Bridge Youth Hall. 

Decorated the Lounge. 

Replaced Lounge light fittings with LED’s. 

Main men’s toilets had all the plumbing in the urinals replaced. 

Re upholster the armchairs in the Bridge Youth Hall. 

Replaced the stolen sound system in the Bridge Youth Hall. 

New cellar door in the Social Club. 

New kitchen doors in the Social Club. 

5 



Two new manhole covers and repair of third in the cellar of the Social Club. 

New hand dryer in the Disabled toilet. 

Update internet, google maps, and hirer profiles on Website. 

Full electrical check. 

Legionnaire check completed. 

Successful conviction of intruder that stole from  & damaged the Bridge Youth Centre. 

## **Community Involvement** 

The pandemic restricted developments of the Centre.  However, it has offered the opportunity to help, advise and support members especially during the changing restrictions. 

Looking ahead, with the new housing developments locally, the size of Bearwood is growing such that there is even more potential to increase visitors and activities so the future will be focussed on this aim. 

Sadly, we have lost the Bearwood Community Centre and Social Club Magazine that ceased due to the reduced number of able Trustees. 

The website has been updated to include ~~s~~ profiles of the groups offering the various activities at the Centre. 

## **Vision for the future** 

Our  vision  is  of  creating  a  vibrant  and  active  Community  Centre  of  which  the residents of Bearwood can be proud. 

There  is  still  great  potential  for  delivering  improved  community  facilities  and activities which meet the needs of the people of Bearwood, but this has not stopped us setting our sights higher and we continue to consider how to expand what we do in order that more people can benefit from a first-class community facility. 

The achievements over the past fifteen years have provided the basis for achieving this vision and combined with our plans for future development and the significant investment  we  are  continuing to make,  this  will position Bearwood  Community Centre to be a valuable and beneficial resource for the Bearwood community and a place of which we can all be proud. 

## **Finances – Treasurer’s Report for 2020** 

While the revenue income of the Association was decreased in 2020, expenditure on non-capital items remained roughly the same. this was due in part to wage costs. 

Total Income of £71228.96 including a £25,000 Covid grant, £14,790 Youth Toilet Grant and £2,000 from the BCP Council in 2020. 

6 



Total Expenditure of £58,656. (£6,201 capital). 

A deposit of £3,000 was made to improve the disabled access into the Centre (this has yet to be completed). 

We have a policy to pay all our invoices promptly. 

As the Centre has more groups using our facilities any problems with late payment of  hire  fees,  results  in  steps  being  taken to  collect  these  sums  to  prevent an accumulation of amounts outstanding. 

We still have a reserve account of £31,000. 

Most regular outgoings are paid by monthly direct debit to even out cash flow and any invoices for other items are paid promptly. 

The Association is grateful to the BCP Council for the grant of full relief of business rates under their discretionary grant scheme.  This is equivalent to a grant of some £10,000 and without this continuing assistance the Association’s finances would be in considerable jeopardy. 

7 



**BEARWOOD COMMUNITY CENTRE ASSOCIATION INCOME & EXPENDITURE 1 January 2020 to 31 December 2020** 

|**BALANCE BROUGHT**||||39,033.0|
|---|---|---|---|---|
|**FORWARD**|||£|7|
|**INCOME**|||||
|||3,690.0|||
|Club Contribution|£|0|||
|Function|£|1944.50|||
|Membership Fees|£|5895.00|||
|||17039.4|||
|Rent Income|£|6|||
|Publicity|£|0.00|||
|||42660.0|||
|Other Income|£|0|||
|Transfer from Deposit|£||||
|||||71228.9|
|**_TOTAL INCOME_**|||£|6|
||||-------------------||
||||--||
|||||**110262.**|
||||£|**03**|
|**EXPENDITURE**|||||
|Hand heater|_£_|210.00|||
|Sound Tec|_£_|609.00|||
|CCTV|_£_|110.40|||
|Exterior Door|_£_|1810.00|||
|Disabled Access|_£_|3000.00|||
|Down Lights|_£_|168.00|||
|Kitchen Units|_£_|294.00|||
|**_TOTAL Capital_**|||||
|**_Expenditure_**|_£_||£|**6201.40**|
|||||20,920.0|
|Centre Management Fee|||£|0|
|Cleaning|||£|9,420.00|
|Cleaning Materials|||£|817.63|
|Contract Renewal|||£|144.78|
|Insurance|||£|3,234.49|
|Miscellaneous Expenses|||£|1675.50|
|Mobile Top Up|||£|683.84|
|Donations|||£|670.00|
|Web Site|||£|1914.00|
|Charity|||£||
|Petty Cash Disbursements|||£|400.00|
|**Repairs and Maintenance**|||||
|Others|1,736.75||||
|Plumbing|55.00||||
|Electrical|770.92||||
|Floor Maintenance|2,412.00||||



8 



Redecoration/BW 

3,308.00 

|**TOTAL Repairs and**||||||
|---|---|---|---|---|---|
|**Maintenance**||||£|**8282.67**|
|Subscription||||£||
|Stationery||||£|118.15|
|**Utilities**||||||
|Electricity|£||-206.20|||
|Gas|£||2310.00|||
|Telephone|£||744.00|||
|Water|£||1326.00|||
|**_TOTAL Utilities_**|||||**4173.80**|
|_Transfer to Deposit_||||||
||||||**58656.2**|
|**TOTAL EXPENDITURE**||||£|**6**|
|**BALANCE CARRIED**|||||**51605.7**|
|**FORWARD**||||£|**7**|
|**RESERVE BANK ACCOUNT**||**31,194**||||
|**Held in Petty Cash**||**57.95**||||




## **Acknowledgements** 

BCCA would like to record their grateful thanks to the very able Centre Manager, Lynn Rowe, who has continued to ensure the smooth running of the centre and 

9 



makes sure the maintenance of good relationships with the groups using the centre as well as with the members and visitors, while at the same time working towards the future development of the activities.  Our extra appreciation to her during this pandemic  year  for  the  added  pressure  and  commitment  she  has  taken  on  in ensuring that government guidelines were in place, advising hirers and reading endless Risk assessments to enable a safe environment for all.   Also, fulfilling the role of Secretary & for taking over the invoicing for the year. 

We would also not be able to carry on with our continuing success without the quiet, consistent, and excellent standard of work of our cleaner, Mark Hope, and we are very grateful to him for maintaining a clean and pleasant facility for all our visitors and coping with the increasing cleaning procedures of the centre. 

The committee have worked with various organisations during the year, and we should like to record our thanks to them for their support. 

- **CAN** for their substantial support in providing advice, guidance, and encouragement. 

- **All our numerous suppliers and contractors** during our ongoing developments. 

- **Amanda  Nicholls  –  BCP  Council  Community  Liaison  Officer** for  her continued support to our Centre Manager. 

There are several people we would like to thank for their support in the last year: 

- **Sharon Raymond** for stepping in and rescuing our accounts at a difficult time. 

- **Alan Hart** as our Auditor for taking the time to study and report on our financial position. 

- **Leslie Legg** is consistently available to advise our Centre Manager. 

- **Lesley  Scotter** who  has  ably  performed  the  role  of  Minutes  Secretary throughout the year. 

- **Bearwood Social Club committee and members** for their cooperation with the Association. 

- **Bearwood Social Club bar manager (Jody),cleaner (Carol) and bar staff** for supporting and being there for our Centre Manager. 

- **All the groups using the centre, their leaders, and members** for their continuing support. 

- **All the volunteers** who have given their time to the Community Centre in so many ways. 

_Bearwood Community Centre Association_ 

10 



## **Large Print requirements** 

If you would like copies of this Annual Report in large print, please contact the Secretary who will be happy to arrange this for you. 

_Bearwood Community Centre Association._ 

## _Telephone: 07975627515_ 


**Bearwood Community Centre King John Avenue Bearwood Bournemouth Dorset BH11 9TF** 

**bearwoodcca@hotmail.co.uk** 

**www.bearwoodcommunitycentre.co.uk** 

11 



|||Money in|Money Out|Total held in PC|
|---|---|---|---|---|
|11/20/2020|Withdrawn|400.00|||
|11/04/2020|Vodafone||51.49 Mobile||
|11/04/2020|The Range||11.98 cleaning & bateries||
|11/17/2020|HP Ink||7.99 Ink||
|11/17/2020|Timpson||10.50 Key cut||
|11/17/2020|HP Ink||7.99 Ink||
|||400.00|89.95|310.05|
|12/04/2020|Vodafone||64.74 Mobile||
|12/05/2020|Bearcross||125.00 5 gifs||
|12/16/2020|HP Ink||9.99 Ink||
|12/18/2020|S C Cleaner||50.00 cash gif||
|12/20/2020|I cloud||2.37 Oct-Dec||
|||310.05|252.10|57.95|





## BCCA CASH FLOW 

|Cash Book Balance b/fwd<br>**EXPENDITURE**<br>**_Direct Debits_**<br>**DAY**<br>Pennon Water Services<br>1st<br>Wessex Water Sewage<br>1st<br>BT Phone 581843<br>5th<br>Gas<br>15th<br>Electricity<br>15th<br>Insurance<br>26th<br>Cleaning<br>Web Site<br>Centre Management Fee<br>Miscellaneous<br>Mobile Top-up<br>Contract Renewals<br>**_Repairs and Maintenance_**<br>Plumbing<br>Electrical<br>Others<br>Floor Maintence<br>Decoraton BWS<br>Donations/Subscription<br>Cleaning Materials<br>Stationery<br>Contract Renewals<br>**_Capital Expenditure_**<br>Water Heater<br>Sound Tech<br>CCTV<br>Exterior Door<br>Disabled Access<br>Down light<br>Hall tables/Chairs/China<br>Install Kitchen unit<br>**Petty Cash Disbursements**<br>**Total Expenditure**<br>**INCOME**<br>Hire Income<br>Functions<br>**Publicity**<br>Social Club Contribution<br>Membership Fees Share<br>Miscellanous Income<br>**Odds**<br>**Total Income**|**Actual**<br>**Actual**<br>**Actual**<br>**Actual**<br>39,033.07     39,048.90     41,856.93     42,127.21<br> **January**<br>**February**<br>**March**<br>**April**|
|---|---|
||58.50            58.50            58.50            58.50<br>62.00            62.0062.0062.00<br>210.00          210.00          210.00          210.00<br>228.00          228.00          228.00          228.00<br>321.69          321.69          321.69          321.69<br>785.00          785.00          785.00          785.00<br>18.00            18.00          378.00            18.00<br>1,500.00       1,500.00       2,420.00       1,500.00<br>780.50<br>43.21            43.15            55.99<br>128.92<br>247.50<br>912.00<br>520.00<br>103.20<br>16.98            69.88              7.99<br>3,000.00|
||4,672.80       6,296.22       5,789.87       3,183.19|
||1,997.63       2,695.75       4,400.15          945.50<br>1,171.00          623.50<br>700.00          700.00          850.00          850.00<br>5,085.00          810.00<br>300.00<br>520.00|
||4,688.63       9,104.25       6,060.15       1,795.50|





|**Cash Book Balance**|39,048.90|41,856.93|42,127.21     40,739.52|
|---|---|---|---|
|**Unpresented cheques**||518.70|168.00          168.00|
|**Current A/c Bank Balance**|39,048.90|41,338.23|41,959.21     40,571.52|
|**Deposit A/c Bank Balance**|31,170.53|31,170.53|31,181.46     31,181.46|





## W JANUARY TO DECEMBER 2020   Final version. 

|**Actual**|**Actual**|**Actual**|**Actual**|**Actual**|**Actual**||**Actual**|
|---|---|---|---|---|---|---|---|
|40,739.52|62,068.50|55,488.73|52,124.55|47,425.12|44,880.67||55,472.35|
|**May**|**June**|**July**|**August**|**September**|**October**|**November**||
|136.50|136.50|136.50|136.50|136.50|136.50||136.50|
|62.00|62.00|62.00|62.00|62.00|62.00||62.00|
|210.00|210.00|210.00|210.00|210.00|210.00||210.00|
|228.00|228.00|228.00|228.00|228.00|-|-|2,383.86|
|||324.68|324.61|324.61|324.61||324.61|
|785.00|785.00|785.00|785.00|785.00|785.00||785.00|
|18.00|18.00|18.00|378.00|18.00|36.00||418.00|
|1,500.00|1,500.00|1,500.00|1,500.00|1,500.00|2,556.25||2,043.75|
|||||150.00|370.00|||
|119.83|||||211.66|||
|144.78||||||||
||||||55.00|||
|||||642.00||||
||||1,162.32|45.00|150.00||131.93|
|1,500.00||||||||
||3,308.00|||||||
||||150.00|||||
|66.36|164.27|100.00|||383.80|||
|23.30||||||||
||||||||210.00|
||||||609.00|||
||||||||110.40|
||||||||1,810.00|
||168.00|||||||
||||||294.00|||
||||||||400.00|
|4,793.77|6,579.77|3,364.18|4,936.43|4,101.11|6,183.82||4,258.33|
|427.75|||237.00|1,556.66|1,890.50||882.52|
|55.00|||||95.00|||
|590.00||||||||
|25,050.00|||||14,790.00||2,000.00|
|26,122.75|-|-|237.00|1,556.66|16,775.50||2,882.52|





62,068.50     55,488.73     52,124.55     47,425.12     44,880.67     55,472.35     54,096.54 168.00          742.00          642.00          642.00       1,088.00       2,662.33 61,900.50     54,746.73     51,482.55     46,783.12     43,792.67     52,810.02     54,096.54 31,181.46     31,189.83     31,189.83     31,189.83     31,194.15     31,194.15     31,194.15 



|**Actual**<br>54,096.54<br>**December**|<br> <br> <br>**Totals**<br>1,326.00<br>-<br>744.00<br>2,310.00<br>-             206.20<br>3,234.49<br>9,420.00<br>1,914.00<br>20,920.00<br>1,675.50<br>683.84<br>144.78<br>-<br>55.00<br>770.92<br>1,736.75<br>2,412.00<br>3,308.00<br>670.00<br>817.63<br>118.15<br>-<br>-<br>210.00<br>609.00<br>110.40<br>1,810.00<br>3,000.00<br>168.00<br>-<br>294.00<br>400.00<br>58,656.26Vertcal total<br>58,656.26Horizontal total<br>-<br>17,039.46<br>1,944.50<br>-<br>3,690.00<br>5,895.00<br>42,140.00<br>520.00<br>71,228.96Vertcal total<br>71,228.96Horizontal total<br>**Balances c/fwd**|
|---|---|
|136.50<br>62.00<br>125.66<br>324.61<br>785.00<br>578.00<br>1,900.00<br>375.00<br>210.00||
|4,496.77||
|2,006.00||
|2,006.00||
|||





51,605.77          51,605.77 

51,605.77 

31,194.93 




## **BEARWOOD COMMUNITY CENTRE ASSOCIATION INCOME & EXPENDITURE** 

## **1 January 2020 to 31 December 2020** 

|**BALANCE BROUGHT FORWARD**|**BALANCE BROUGHT FORWARD**|£|39,033.07|
|---|---|---|---|
|**INCOME**||||
|Club Contribution|£|3,690.00||
|Function|£|1944.50||
|Membership Fees|£|5895.00||
|Rent Income|£|###||
|Publicity|£|0.00||
|Other Income|£|###||
|Transfer from Deposit|£|||
|**_TOTAL INCOME_**||£|71228.96|
|||-------------------------------||
|||£|110262.03|
|**EXPENDITURE**||||
|Hand heater|_£_|210.00||
|Sound Tec|_£_|609.00||
|CCTV|_£_|110.40||
|Exterior Door|_£_|1810.00||
|Disabled Access|_£_|3000.00||
|Down Lights|_£_|168.00||
|Kitchen Units|_£_|294.00||
|_TOTAL Capital Expenditu£_||£|6201.40|
|Centre Management Fee||£|20,920.00|
|Cleaning||£|9,420.00|
|Cleaning Materials||£|817.63|
|Contract Renewal||£|144.78|
|Insurance||£|3,234.49|
|Miscellaneous Expenses||£|1675.50|
|Mobile Top Up||£|683.84|
|Donations||£|670.00|
|Web Site||£|1914.00|
|Charity||£||
|Petty Cash Disbursements||£|400.00|
|Repairs and Maintenance||||
|Others|1,736.75|||
|Plumbing|55.00|||
|Electrical|770.92|||
|Floor Maintenance|2,412.00|||
|Redecoraton/BW|3,308.00|||
||-------------------------------|||
|TOTAL Repairs and Maintenance||£|8282.67|
|Subscription||£||
|Stationery||£|118.15|
|Utilities||||
|Electricity|£|-206.20||
|Gas|£|2310.00||
|Telephone|£|744.00||





|Water|£|1326.00|||
|---|---|---|---|---|
||-----------------------------||||
|_TOTAL Utilities_||||4173.80|
|_Transfer to Deposit_|||||
||||-------------------------------||
|**TOTAL EXPENDITURE**|||£|58656.26|
|**BALANCE CARRIED FORWARD**|||£|51605.77|
|**RESERVE BANK ACCO**||**31,194**|||
|**Held in Petty Cash**||**57.95**|||





## **Independent Examination Checklist** 

## **Direction 1** 

## **Check whether the charity is eligible to have an independent examination.** 

Income is reported as £71,228.96 and so is above the threshold for external scrutiny, but well below the threshold for an audit. The aggregate value of the Charity’s assets is £51,605.77 which also is less than the audit threshold. The governing document does not require an audit. There are no subsidiaries. 

## **Direction 2** 

## **carrying out their independent examination.** 

I have no personal or financial involvement in the Charity. 

## **Direction 3** 

## **Record your independent examination.** 

See below. 

## **Direction 4** 

## **Plan the independent examination.** 

I am familiar with the overall structure of the Charity and its accounting procedures, having examined the accounts for several years prior to this one. No significant changes have been made to the way it operates. 

## **Direction 5** 

## **Check that accounting records are kept to the required standard.** 

I have checked the accounting records, and I believe that there are no significant matters of concern. 



## **Independent examiner’s report to the trustees of Bearcross Community Centre (‘the Trust’)** 

I report to the trustees on my examination of the attached accounts of the Bearcross Community Centre Trust (the Trust) for the year ended 31 December 2020. 

## **Responsibilities and basis of report** 

As the charity trustees of the Trust you are responsible for the preparation of the accounts in accordance with the requirements of the Charities Act 2011 (‘the Act’). 

I report in respect of my examination of the Trust’s accounts carried out under section 145 of the 2011 Act and in carrying out my examination I have followed all the applicable Directions given by the Charity Commission under section 145(5)(b) of the Act. 

## **Independent examiner’s statement** 

I have completed my examination. I confirm that no material matters have come to my attention in connection with the examination giving me cause to believe that in any material respect: 

1. accounting records were not kept in respect of the Trust as required by section 130 of the Act; or 

2. the accounts do not accord with those records. 

I have no concerns and have come across no other matters in connection with the examination to which attention should be drawn in this report in order to enable a proper understanding of the accounts to be reached. 

Signed: 


Name: A R Hart, B.Sc London University Address: Flat 10 St James Court, 26 The Avenue, Poole, Dorset. BH13 6BF. Date: 12 November 2021. 